My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/03/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:20:24 PM
Creation date
8/10/2016 12:01:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/03/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patrick S. Walther, P.E. <br />March I8, 2016 <br />Page 2 <br />SCOPE OF WORK <br />TASK 1- TRAFFIC SIGNAL PLANS PREPARATION <br />The signalization modification plans will be prepared in conformance with State and Federal <br />guidelines regarding traffic signal design in conjunction with the additional proposed lanes along 41s' <br />Street and Old Dixie. <br />The various tasks required in conjunction with the development of the traffic signal plans are as <br />follows: <br />A. Signalization Plan - The signalization plan will be prepared in MicroStation, in a standard <br />plan format of 11" x 17," and at a scale of 1" = 40'. Basic information presented on the plan <br />shall include, but shall not be limited to, roadway geometry, pavement markings, traffic <br />regulatory signs, street names, constriction stationing, drainage inlets, sidewalks, right-bf- <br />way lines and conflicting underground and overhead utilities. This information will be <br />required to ascertain the location for the proposed mast arms and traffic and pedestrian <br />- signal -related equipment - - - - - — -- - - - - <br />Detailed information, including type and location, will be provided for signal heads, <br />pedestrian signals, pedestrian detectors, signal poles, regulatory signs, and other <br />appropriate details. We will coordinate with the appropriate governmental agencies to <br />ensure that the signal hardware is compatible with other signals along the corridor. <br />The fee does not include costs for designing utility relocation plans. McMahon will, <br />however, send one set of plans to each affected utility company in order to obtain current <br />utility information to be included on the plans. McMahon will make every effort to design <br />the traffic signal to avoid any existing utilities. If utility relocation is necessary, the utility <br />relocation design and plans can be created under a supplemental work agreement. <br />B. General Note Sheet - A general construction note sheet will be prepared, and will be <br />included with the plan set package. The general notes will include general construction <br />information, utility operation data, maintenance of traffic information, and reference to <br />standard or special construction details/notes as required by the Florida Department of <br />Transportation (FDOT). <br />C. Quantities Sheet - The quantities sheet will include a tabulation of items, quantity of <br />materials with descriptions, and type of work for the location. Specific notes referencing <br />pay items or indicating special design information will also be indicated. <br />95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.