My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/03/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:20:24 PM
Creation date
8/10/2016 12:01:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/03/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 Design <br />CAI will prepare plan and profile drawings of each of two water main adjustments at conflicts with <br />storm water curb inlets. CAI will prepare plan sheets for two water meter/backflow .preventer <br />relocations; one fire hydrant relocation; and top .adjustments for sanitary sewer manholes and <br />valves. CAI will prepare detail sheets, MOT quantity take -off, general notes sheet and technical <br />specifications for the proposed utility adjustments. Separate design drawing ,sheets will be <br />generated to be included in the bid/construction plan set that clearly identify all utility adjustments. <br />The storm sewer piping design will be modified in the roadway design plans to lower the storm <br />piping to avoid conflicts at the two locations in Old Dixie HWY, <br />Task2 fees are ............................................................................................$8,180.00 <br />Task -3 Permitting <br />CAI will utilize the permitting exemption found in paragraph 62-555.520(l)(c)3. of the Florida <br />Administrative Code for relief from a Florida Department of Environmental Protection (FDEP) <br />permit. CAI will submit plans to the Department to obtain the exemption. <br />Task3 fees are ..............................:................................................................$560.00 <br />Total......... ....... .................................................................................$11,060.00 <br />Reimbursables Estimated at....... _..................................................................$200.00 <br />Grand Total............................................................................................$11;260.00 <br />.Assumptions <br />In developing this proposal, CAI represents to the COUNTY that the following assumptions have <br />been made and that deviation from these assumptions may require additional.expenditures on behalf <br />of the COUNTY to CAI. <br />1. CAI assumes no county Right -of -Way or Utility permit will be required for this project. <br />2. CAI assumes the project will not require an FDEP permit. <br />3. CAI assumes installation of isolation valves and details of such will. not be required for <br />water main adjustments. It is assumed that the County Utilities will isolate the segments to <br />be adjusted by turning existing valves off. County Utilities will be responsible for turning <br />the valves off and notifying customers of all temporary outages. <br />4. No permitting, application, impact and/or testing fees are included and will be paid for by <br />the COUNTY or Contractor (as applicable) separately. <br />_ semi Florida <br />Since 1911 <br />N-.\PSW1P1]4-84E IRC 41st St\Proposals\Amendment 1 Proposal2-4-2016.doc Page 2 of 3 <br />74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.