My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/03/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:20:24 PM
Creation date
8/10/2016 12:01:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/03/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CAI will prepare detailed construction drawings which will include revised roadway grading <br />plan/profile sheets, revised drainage, revised typical sections and cross:section sheets, <br />revised striping and signage sheets, revised summary of quantities sheet, and revised general <br />notes, details and specification sheets. <br />• CAI will coordinate with City of Vero Beach Electric Department, Comcast and AT&T to <br />keep the utilities advised of the design changes and to facilitate any new utility adjustments <br />that may result from the redesign. <br />• CAI will coordinate with CAI's signalization subcontractor (McMahon Associates, Inc.) to <br />facilitate any signalization adjustments that may be required as a result of the redesign. <br />• CAI will coordinate with the FDOT to void the previous submitted permit application. CAI <br />will coordinate with the FDOT to address drainage, signalization, utility and roadway <br />connection permit requirements and CAI will prepare and submit new FDOT permit <br />application(s). <br />• CAI will prepare and submit an application for a permit modification to the existing <br />SJRWMD permit. <br />• CAI will resubmit the revised design drawings to the FECRR and to their consultant, Xorail. <br />CAI will coordinate with FECRR / Xorail to obtain FECRR permit. <br />• CAI will prepare a revised Opinion of Construction Cost. <br />.• CAI will submit the revised detailed construction drawings to COUNTY engineering staff <br />for review and comment. <br />Compensation:_ <br />CAI's fees are.....................................................................$50,270.00 <br />McMahon's fees are summarized as follows (Reference Attachment): <br />Task 1. — Mast Arra Revisions @ US 1 ....................................:.......$3,'x'40.00 <br />Task 2 — Structural' Wpo>t analysis ..............................................$2.180.00' <br />McMahon's fees total.........::....:....:...............................................$5,920.00 <br />Grand Total.......................................................................$56,190.00 <br />CAI looks forward to furnishing the services described herein. If you have any questions .regarding <br />our proposed scope of work, please feel free to call me at your convenience. <br />Sincerely, <br />C7 SOCIATES, INC. <br />Patrick S. Walther, P.E. <br />Principal/ Project Manager <br />Attachment <br />sqving ilorida <br />Since 1911 <br />N.\PSW\P\14-84E IRC.41st St\ProposalslRevAmendment 2 Proposal 4-5-2016.doc Page 2 of 2 <br />81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.