My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/03/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:20:24 PM
Creation date
8/10/2016 12:01:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/03/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRANSPORTATION ENGINEERS & PLANNERS <br />March 17, 2016 <br />VIA E-MAIL <br />Mr. Patrick S. Walther, P.E. <br />Carter Associates, Inc <br />170821st Street <br />Vero Beach, Florida 32960 <br />McMAHON ASSOCIATES, INC. <br />2090 Palm Beach Lakes Blvd, Suite 400 1 West Palm Beach, FL 33409 <br />p 561-840-8650 1 f 561-840-8590 <br />mcmahonassociates.com <br />REi US -1 at 4151 Street Signal Design Plan — Supplemental Agreement No.1 <br />McMahon Project No. N15067.OP <br />Dear Pat: <br />PRINCIPALS <br />Joseph W. McMahon, P.E. <br />Joseph, J. DeSantls, P.E., PTOE <br />John S. OePalma <br />William T. Steffens <br />Casey A. Moore, P.E. <br />Gary R. McNaughton, P.E., PTOE <br />ASSOCIATES <br />John J. Mitchell, P.E. <br />Christopher J. Williams, P.E. <br />R. Trent Ebersole, P.E. <br />Matthew M. Kozsuch, P.E. <br />Maureen Chlebek, P.E., PTOE <br />McMahon Associates, Inc (McMahon) is pleased to provide this supplemental agreement for the US -1 <br />at 41st -Street Signal Design project, in Vero Beach, Florida. This proposal is for additional services <br />related to a design modification to the traffic signal at US -1. <br />This agreement is based on the assumption that all project baseline geometry, existing and proposed <br />right-of-way, topographic, gebtechnical, and sub -surface utility exploration" (SUE) information <br />necessary to complete the design will be provided by Carter Associates, Inc. <br />In order to provide the proper design for the traffic signal_ supports, subsurface soil information must <br />be provided by Carter Associates, Inc. Soil borings will be obtained in the field by a Geotechnical <br />Engineer, at all corners of the study intersection. The geotechnical information will be analyzed and <br />the project Geotechnical Engineer will provide a standard report. This information will be t;tilized for <br />the design of traffic signal mast arm supports. If right-of-way or other project constraints dictate that a <br />proposed mast arm base must be placed in the vicinity of an existing underground utility, then Carter <br />Associates, Inc. will provide the sub -surface utility exploration (soft dig) necessary to identify the <br />utility conflict. If additional right-of-way or easements are required for the proposed signal equipment <br />locations, Carter Associates, Inc. will obtain the necessary agreements. <br />The Scope of Work includes the following tasks: <br />SCOPE OF WORK <br />TASK 1— MAST ARM DESIGN REVISIONS AT US -1 <br />The original agreement scope of work for the design of a traffic signal at US -1141& Street included the <br />installation of one new mast arm due to conflicts with the proposed travel lane modifications. <br />Corporate Headquarters: Fort Washington, Pennsylvania <br />Serving the East Coast from 13 offices throughout New England, the Mid -Atlantic, and Florida <br />82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.