My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/10/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/10/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:26:50 PM
Creation date
8/10/2016 12:23:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/10/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />AGREEMENT FOR PROFESSIONAL SERVICES <br />Work Order No. 4 <br />(Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract #1333 <br />Indian River County Project #1611 <br />Task 2: Cross Sections <br />7) Recover existing survey control and establish baseline of survey. <br />8) Field locate and record five (5) cross sections in two (2) locations of the existing Lateral J Canal to <br />be determined by the engineer. Cross Sections shall extend to 20 feet east of the east top of bank <br />of the Lateral J Canal. <br />9) Field locate and record seven (7) cross sections of the existing Lateral J-1 Canal and 51h Street <br />S.W. at locations to be determined by the engineer. Cross Sections shall extend to the north right <br />of way line of 51h Street S.W. <br />10) Process field data, integrate with existing survey described in Task 1, and prepare survey drawing <br />in accordance with the Standards of Practice for Surveying to include cross section sheets. <br />Prepare final deliverables. t <br />Time of Completion and Deliverables: <br />1. Project shall be completed as follows: <br />a. 100 % "Paper" review submittal (final review prior to final deliverables) shall be made within <br />45 calendar days of receipt of Notice to Proceed for review by County Staff prior to <br />preparing final submittal package. <br />b. Time of Final project completion shall be within 5 business days of receipt of the County's <br />review comments from the 100% paper submittal. <br />2. Deliverables -The SURVEYOR shall provide the COUNTY: <br />a. 100% Phase Submittal for County review and comment. All submittals shall include one (1) <br />paper "hardcopy" along with Autocad files and an ASCII file for all survey points. County <br />shall strive to provide review comments within 10 calendar days of the preliminary submittal. <br />b. FINAL Deliverables, Four (4) paper "hardcopy" signed and sealed sets in adequate <br />recording fashion (I.E. Borders). Sheeted and model space (as applicable) AutoCAD Land <br />Desktop drawing file compatible with Release 2010-2016, PDF formats and an ASCII file for <br />all survey points, all electronic files to be on CD. <br />c. Survey set/sheets shall include a cover sheet with location sketch, survey certifications, and <br />related title and project number; survey notes, legend and abbreviations and plan view <br />sheets. <br />d. Work product and digital versions are to be prepared and submitted so that the County or <br />other consultants can readily use it for design and analysis of the area, as defined. It shall <br />contain all information necessary for a third party surveyor to independently recreate or <br />utilize the survey work. It is acknowledged all final products become property of Indian <br />River County and will be available for use by the public at large. <br />e. The SURVEYOR's work product shall meet or exceed the minimum standards defined by <br />Sections II, III and IV or the COUNTY will not approve the SURVEYOR's request for <br />payment. <br />Masteller, Mo/er & Taylor, Inc. <br />1655 27th Street, Suite 2 <br />Vero Beach, FL 32960 <br />Phone- 772-564-8050, Fax: 772-794-0647 <br />E-mail: dt5243CcDbellsouth.net <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.