My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/10/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/10/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:26:50 PM
Creation date
8/10/2016 12:23:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/10/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />AGREEMENT FOR PROFESSIONAL SERVICES <br />Work Order No. 4 <br />(Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract #1333 <br />Indian River County Project #1611 <br />Compensation: <br />Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services <br />Agreement, Contract No. 1333 with the Indian River County. <br />I. Project initiation, including review of existing surveys, files and field notes, <br />preparation of work orders and field crew folders. Recover and measure field ties into <br />existing survey control as established by Indian River County and establish a <br />baseline of survey. <br />Surveyor 1 hours @ $ 120.00/hr $ 120.00 <br />Field Supervisor 1 hours @ $ 90.00 /hr $ 90.00 <br />Survey Technician 1 hours @ $ 75.00/hr $ 75.00 <br />Administrative 2 hours @ $ 40.00/hr $ 80.00 <br />Survey Crew 6 hours @ $ 115.00 /hr 690.00 <br />Total I .....................................$ 1,055.00 <br />II. Field locate and obtain vertical ground elevations on 100 foot grid throughout the <br />site which includes approximately 29,500 linear feet of line clearing. Clear one line <br />down the center of the property suitable for use by environmental consultant <br />Topography shall extend 50 feet outside the boundary and to the top of bank of the <br />existing canals regardless of distance. Locate and obtain elevations as applicable of <br />all visible improvements, including but not limited to buildings, pavements, wells, <br />drainage structures, culverts, and visible utility appurtenances or markers within the <br />project area and 50 feet outside the boundary and to the top of bank of the existing <br />canals regardless of distance. Locate existing dirt trails or roads within the subject <br />property. <br />Surveyor 4 hours @ $ 120.00/hr $ 480.00 <br />Field Supervisor 20 hours @ $ 90.00 /hr $ 1,800.00 <br />Survey Crew 185 hours @ $ 115.00 /hr $21,275.00 <br />Total 11 ...................................... $23,555.00 <br />III. Process field data, integrate with existing County survey, calculate digital terrain <br />module and interpolate one foot contours, and prepare survey drawing in accordance <br />with the Standards of Practice for Surveying including cover sheet with location <br />sketch, certifications, related title and project number, notes, legend, abbreviations <br />and plan view sheets. Prepare final deliverables. <br />Surveyor 5 hours @ $ 120.00/hr $ 600.00 <br />Survey Technician 32 hours @ $ 75.00/hr $2,400.00 <br />Administrative 4 hours @ $ 40.00/hr 160.00 <br />Total III ..... .. .. .. ..................$3,160.00 <br />Masteller, Moler & Taylor, Inc. <br />1655 27th Street, Suite 2 <br />Vero Beach, Fl 32960 <br />Phone: 772-564-8050, Fax: 772-794-0647 <br />E-mail: dt524 3CcDbellsouth.net <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.