My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-103A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-103A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 10:00:05 AM
Creation date
8/15/2016 3:39:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/12/2016
Control Number
2016-103A
Agenda Item Number
8.G.
Entity Name
All Webbs Enterprises
Subject
Water Treatment Plant South County and South Oslo Road
Area
Floridan Aquifer Wells
Project Number
2016031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTE:— �^ I c l <br />05 -NI NO: <br />NDFY NO: LOLL, t1 <br />Agreement <br />Bid No. 2016031 <br />South County Water Treatment Plant Well No. 7, Well, Wellhead and Appurtenances and <br />South and South Oslo Road Water Treatment Plant Floridan Aquifer Wells Rehabilitation <br />Project <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State <br />of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />All Webbs Enterprises, Inc. (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents as <br />set forth in Article 8 of this Contract. The Work is generally described as follows: <br />Contractor as an independent contractor and not as an employee shall furnish and complete all of <br />the necessary labor, material and equipment to perform the work as specified or indicated in the <br />Contract Documents and per FDEP, the Indian River County Department of Utility Services and <br />County Engineering Department standards. The work is generally described as follows: <br />The proposed work generally consists of furnishing all labor, materials, tools and equipment to <br />construct a 16 -inch diameter Upper Floridan Aquifer production well to a depth of approximately 700 <br />feet below land surface, including pump assembly, electrical panel, telemetry equipment, discharge <br />piping (including valves, flowmeter and fittings), pedestal, housekeeping pad, and pipe supports. All <br />work will include maintaining traffic control, complete restoration and all other appurtenant and <br />miscellaneous related items and work for a completed project. It is the intent of the Indian River <br />County Department of Utility Services to obtain complete and working installations under this contract <br />and any items of labor, equipment, and materials that may reasonably be assumed as necessary to <br />accomplish this end shall be supplied whether or not they are specifically stated herein. All work as <br />shown on the construction plans will be done in accordance with the Indian River County Department <br />of Utility Services Water & Wastewater Utility Standards, (December 2015) or latest edition, unless <br />specified differently in the individual Work Authorizations or changed by the Engineer or his <br />representative. The work is located in the South County Park directly east of the South County Water <br />Treatment Plant on 201h Avenue, North of Oslo Road. <br />The construction of the utility improvements described above shall also consist of, but not limited to: <br />resetting of existing facilities disturbed during construction; utilities exploration; coordination with any <br />permitting agencies; trenching; clearing and tree removal; dewatering; installation of pipe, structures <br />and all appurtenances; fittings and restrainers; soil backfill compaction; testing; (including backfill and <br />subgrade testing); road, landscape and driveway restoration; re -grading and grassing (sod); <br />mobilization, demobilization and traffic control. No excavation shall be left open when work is not <br />actively being performed. Construction fencing used in the work area shall not block sight distance <br />near intersections or driveways. All construction equipment and materials shall be stored in a manner <br />that does not disrupt park operations. <br />Section 00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.