My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-103A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-103A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 10:00:05 AM
Creation date
8/15/2016 3:39:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/12/2016
Control Number
2016-103A
Agenda Item Number
8.G.
Entity Name
All Webbs Enterprises
Subject
Water Treatment Plant South County and South Oslo Road
Area
Floridan Aquifer Wells
Project Number
2016031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor is responsible for obtaining a S8. Johns River Water Management District Well <br />Construction Permit and filing the corresponding well completion report. The County has obtained the <br />necessary Consumptive Use Permit and Florida Department of Environmental Protection Potable <br />Water System Component Permit. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project horvvhichtheVVorkundertheContna(tDucunnen1nnnaybogenongUydesnribedaa <br />follows: <br />Project Name: South County Water Treatment Plant Well No. 7' Well, VVm||hwad and <br />Appurtenances and South Oslo Road Water Treatment Plant Floridan <br />Aquifer Wells Rehabilitation Project <br />Bid Number: 2015031 <br />Project Address: Somth County Park, 28mAvenue and Oslo Road. <br />ARTICLE 3 — TERM AND CONTRACT TIMES <br />3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 180 calendar days from effective date of Notice to Prnomed. Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all rnabaha|s and equipment to be <br />utilized in the job. <br />l Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities inthe area ofwork. <br />5. Mobilize all |abor, equipnnent, and materials. <br />O. Deliver and otVna all equipment and materials tothe job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />8. Construct and equip vve||, nornp|eha concrete vvork, and install electrical and <br />telemetry components. <br />10. Complete all geophysical logging and pump testing. <br />(b) Completion of all tasks outlined above (ie, Subparagraphs m) and b> oonndtub*n <br />Substantial Completion. <br />(o) From 180 calendar days to 240 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />3.02 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion.__ <br />3.03 Liquidated Damages <br />Section 00530-2 <br />