Laserfiche WebLink
Agreement <br />Bid No. 2016032 <br />South County Water Treatment Plant Well No. 7 Raw Water Pipeline <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY. a Political Subdivision of the <br />State of Florida organized and existing under the L8vm; of the State of Florida, (hereinafter called <br />OWNER) and Blue Goose Construction, LLC (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents <br />osset forth inArticle 8cfthis Contract. The Work ksgenerally described asfollows: <br />Contractor as an independent contractor and not as an employee shall furnish and complete all <br />of the necessary |abor, material and equipment to perform the work as specified or indicated in <br />the Contract Documents and perFDEP. the Indian River County Department ofUtility Services <br />and County Engineering Department standards. The work is generally described as follows: <br />The proposed work generally consists of furnishing all |aUor, rnaboha|a, b}0|e and equipment to <br />construct approximately 1,350 LF of 12 -inch PVC watermain, construct approximately 210 LF of <br />16 -inch HOPE water main via horizontal directional drill under the park 8ntnanne, and install all <br />necessary fittings and restraints shown on the project plans, All work will include maintaining <br />traffic nuntro/. complete restoration and all other appurtenant and mniane||onaVus related items <br />and work for a completed project. It is the intent of the Indian River County Department of Utility <br />Services to obtain complete and working installations under this contract and any items of labor, <br />equipment, and materials that may reasonably be assumed as necessary to accomplish this end <br />shall be supplied whether Ornot they are specifically stated herein. All work as ah0vvn on the <br />construction plans will be done in accordance with the Indian River County Department of Utility <br />Services Water & VV8stevvotor Utility Standards, (December 2015) or latest aditi0n, unless <br />specified differently in the individual Work Authorizations or changed by the Engineer or his <br />representative. The work is located in the South County Pork directly east ofthe South County <br />Water Treatment Plant nn28mAvenue, North nfOslo Road. <br />The construction of the utility improvements described above shall also consist of, but not limited <br />to: resetting of existing facilities disturbed during construction; utilities exploration; coordination <br />with any permitting agencies; trenching; o|e8hnQ and tree removal; dewatering; installation of <br />pipe, structures and all appurtenances; fittings and restrainers; soil backfill compaction; testing; <br />(including backfill and subgradetestinO); road. landscape and driveway restoration; re -grading <br />and grassing (sod); mobilization, demobilization and traffic control. Noexcavation shall be left <br />open when work is not actively being performed. Construction fencing used in the work area shall <br />not block sight distance near intersections or driveways. All construction equipment and materials <br />shall be stored in a manner that does not disrupt park operations. The park entrance shall remain <br />open and operational throughout construction. <br />Section 00530-1 <br />