My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-104B
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-104B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 4:15:12 PM
Creation date
8/15/2016 4:14:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/12/2016
Control Number
2016-104B
Agenda Item Number
8.L.
Entity Name
Blue Goose Construction
Subject
Water Treatment Plant South County
Area
Well No. 7
Bid Number
2016032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor is responsible for obtaining all necessary permits. County has obtained the <br />necessary Florida Department of Environmental Protection Potable Water System Component <br />Construction Permit. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be generally described <br />as follows: <br />Project Name: South County Water Treatment Plant Well No. 7 Raw Water Pipeline <br />Bid Number: 2016032 <br />Project Address: South County Park, 20t' Avenue and Oslo Road. <br />ARTICLE 3 — TERM AND CONTRACT TIMES <br />3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 60 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />?. Receive approved shop drawings for all materials and equipment to be <br />utilized in the job. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />9. Construct the water main, including the portion to be installed via horizontal <br />directional drill. <br />(b) Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(c) From 60 calendar days to 90 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />3.02 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute <br />Final Completion. <br />3.03 Liquidated Damages <br />CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br />that OWNER will suffer financial loss if the Work is not completed within the times specified <br />in paragraph 3.01 above, plus any extensions thereof allowed in writing as a change order <br />Section 00530-2 <br />