My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-111
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 10:03:43 AM
Creation date
8/22/2016 10:03:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2016
Control Number
2016-111
Agenda Item Number
8.K.
Entity Name
Atkins North America
Subject
Work Order No.4 Engineering Review and Summary
All Aboard Florida Drainage Reports and Calculations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6MNS <br /> TASK 3: REVIEW AND REVIEW SUMMARY OF SJRWMD AND USACE REPORTS <br /> AND PERMITS <br /> In the event the SJRWMD and/or the USACE issues a permit, the Consultant will review the issued <br /> SJRWMD and/or USACE permits with associated staff reports. Based on that review,the Consultant will <br /> prepare a summary of the permits, permit conditions and staff reports identifying discrepancies or errors <br /> found in such permits, permit conditions and staff reports. This task include a meeting with the County <br /> staff to discuss the summary and findings. Consultant may also serve as an expert witness in an <br /> administrative hearing or litigation,for which services will be addressed under a separate Task Order. <br /> SECTION 2 ASSUMPTIONS AND EXCLUSIONS <br /> 1. Application fees,impact fees and any other fees required by regulatory agencies are considered a direct <br /> expense to the County. <br /> 2. The following assumptions apply to this scope of services: <br /> • The County will provide the Consultant with the permit/application reference numbers for both <br /> agencies (SJRWMD and USACE). The Consultant will make the document request to the <br /> agencies for direct transmittal of the permitting documents. It is assumed the documents will <br /> be readily provided by the agencies,with no need for multiple or special requests. <br /> • The Consultant will evaluate the drainage calculations and design based on existing <br /> jurisdictional agency,permitting requirements and standard engineering design. <br /> 3. Design and permitting is not included in this proposal. <br /> 4. Meetings with jurisdictional agencies is not included in this scope. <br /> 5. The following items are not included in this scope of work: <br /> • Survey. <br /> • Wetland and Endangered Species consulting or evaluation and review. <br /> • Drainage design or permitting. <br /> • Cadd drafting or computer modeling. <br /> 6. The review,summary and RAI's are limited to the available information obtainable from the permitting <br /> agencies and the task budgets provided in the attached summary. If there are additional tasks or review <br /> time that appear warranted,the Consultant will advise the County to request direction. <br /> SECTION 3 SCHEDULE &DELIVERABLES <br /> The following schedule is anticipated for: <br /> A. Twenty-eight calendar days from NTP or availability of Agency provided documents: <br /> • Task 1 —Drainage Reports,Calculations,Agency RAI Review <br /> July 22,2016 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.