Laserfiche WebLink
Exhibit"A" <br /> ATKINS <br /> Proposal to Provide <br /> Professional Engineering Services <br /> for <br /> Indian River County- GEC Task Order <br /> Engineering Review and Summary <br /> All Aboard Florida Drainage Report and Calculations <br /> Within Indian River County, Florida <br /> Indian River County(County)is requesting an engineering review of the drainage reports and calculations <br /> submitted in support of applications made to the Saint Johns River Water Management District(SJRWMD) <br /> and U.S.Army Corps of Engineers(USACE). The intent is to review the submitted reports and calculations <br /> in comparison with the agency permitting requirements and provide a review summary and a list of items <br /> that require additional information. <br /> At the request of the County, ATKINS (Consultant) has prepared a scope of services for providing this <br /> review for the drainage reports and calculations as follows: <br /> SECTION 1 SCOPE OF SERVICES <br /> TASK 1: DRAINAGE REPORTS,CALCULATIONS AND AGENCY RAI REVIEW <br /> Atkins will review the supporting drainage reports and calculations for the applications made to SJRWMD <br /> and USACE for the proposed railway improvements within Indian River County to develop a technical <br /> understanding of the criteria, assumptions and design methodology used for the drainage design. Using <br /> County provided application/permit numbers,the Consultant will submit requests to both agencies to obtain <br /> the documents for review. Items to be reviewed include the following: <br /> • Drainage design methodology and assumptions, <br /> • Design drainage basin delineation, <br /> • Cross drain design, <br /> • Run-off Curve number calculations, <br /> • Roadway crossing and Railway track stormwater management, <br /> • Water Quality calculations. <br /> The Consultant will also review agency(SJRWMD and USACE)issued Requests for Additional <br /> Information along with the subsequent re-submittal from the applicant. Two such reviews are anticipated, <br /> assuming one RAI being issued from each agency. <br /> TASK 2: REVIEW SUMMARY AND REQUEST FOR ADDITIONAL INFORMATION <br /> (RAI) <br /> Based on the findings in Task 1 the Consultant will prepare a review summary and a request for additional <br /> information(RAI)to address areas of concern. This task includes a meeting or conference call with County <br /> staff to discuss the summary and RAI. <br /> July 22,2016 <br /> Pagel of 3 <br />