Laserfiche WebLink
Table Al. Tasks and Deliverables <br /> Stage/Task Task Description Deliverables <br /> 1 Site Selection, Prelim.Water <br /> Testing, Construction <br /> 1(a) Site Selection Written email confirmation that VEN accepts <br /> site as appropriate for pilot build. <br /> 1(b) Pre-Pilot Water Quality Investigations One page report on composite and grab <br /> sample data for nutrients, metals, pathogens <br /> 1(c) Pre-Pilot Settling Studies One page report on concentration and chemi- <br /> cal composition of settable solids <br /> 1(d) Procurement and Construction One page Report with photos confirming pilot <br /> constructed, operational, and secured <br /> 2 Stage 2 Pilot Testing: Plant Down- <br /> Select <br /> 2(a) Aquatic Plant Introduction/Pilot Start One page report describing collection and <br /> addition of plants and confirming pilot start <br /> 2(b) Pilot performance/Crop and Water Weekly email update on pilot status and <br /> Quality analysis of water and tissue samples; collated <br /> data delivered in Task 2c report <br /> 2(c) Report/ Presentation Comprehensive report on species, water <br /> chemistry, treatment performance, and species <br /> down-selection <br /> 3 Stage 3 Pilot Testing: Optimal <br /> Plants and Parameters <br /> 3(a) Pilot Reconfigure/Start One page report, with photos, on pilot <br /> configration, plant introduction -clarifier <br /> installation (option) <br /> 3(b) Performance Monitoring Weekly email updates on crop/water quality <br /> 3(c) Pilot Shut Down and Disassembly One page report, with photos, on final <br /> weighing of crop, removal of materials/ <br /> equipment and site restoration <br /> 3(d) Report/Presentation to County Comprehensive report and presentation <br /> summarizing the overall pilot study findings <br /> 4 Full Scale Design <br /> 4(a) Full Scale Design Report Comprehensive report on large scale system. <br /> Layout, design Flows, effluent projections, load <br /> reductions, harvest and processing plans <br />