My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-116
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 10:53:04 AM
Creation date
8/22/2016 10:53:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/16/2016
Control Number
2016-116
Agenda Item Number
8.W.
Entity Name
Van Ert, Nemoto and Associates LLC
Subject
Pilot Plant study full- scale managed acquatic Plant
pollution removal system harvested biomass
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table Al. Tasks and Deliverables <br /> Stage/Task Task Description Deliverables <br /> 1 Site Selection, Prelim.Water <br /> Testing, Construction <br /> 1(a) Site Selection Written email confirmation that VEN accepts <br /> site as appropriate for pilot build. <br /> 1(b) Pre-Pilot Water Quality Investigations One page report on composite and grab <br /> sample data for nutrients, metals, pathogens <br /> 1(c) Pre-Pilot Settling Studies One page report on concentration and chemi- <br /> cal composition of settable solids <br /> 1(d) Procurement and Construction One page Report with photos confirming pilot <br /> constructed, operational, and secured <br /> 2 Stage 2 Pilot Testing: Plant Down- <br /> Select <br /> 2(a) Aquatic Plant Introduction/Pilot Start One page report describing collection and <br /> addition of plants and confirming pilot start <br /> 2(b) Pilot performance/Crop and Water Weekly email update on pilot status and <br /> Quality analysis of water and tissue samples; collated <br /> data delivered in Task 2c report <br /> 2(c) Report/ Presentation Comprehensive report on species, water <br /> chemistry, treatment performance, and species <br /> down-selection <br /> 3 Stage 3 Pilot Testing: Optimal <br /> Plants and Parameters <br /> 3(a) Pilot Reconfigure/Start One page report, with photos, on pilot <br /> configration, plant introduction -clarifier <br /> installation (option) <br /> 3(b) Performance Monitoring Weekly email updates on crop/water quality <br /> 3(c) Pilot Shut Down and Disassembly One page report, with photos, on final <br /> weighing of crop, removal of materials/ <br /> equipment and site restoration <br /> 3(d) Report/Presentation to County Comprehensive report and presentation <br /> summarizing the overall pilot study findings <br /> 4 Full Scale Design <br /> 4(a) Full Scale Design Report Comprehensive report on large scale system. <br /> Layout, design Flows, effluent projections, load <br /> reductions, harvest and processing plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.