3. Schedule and Timeline: <br /> The schedule and timeline is illustrated in Figure A2 below. Note that days are given <br /> as calendar, rather than work days and the start date is speculative as it will ulti- <br /> mately be determined by factors outside of VEN's immediate control. Indeed, we <br /> have already experienced delays related to preliminary site selection and permit- <br /> ting. As per County requirements, the Pilot Study duration is 12 months (365 days); <br /> with an additional 2 months to complete final reports and to finalize full-scale designs. <br /> Figure A2. Project Timeline <br /> la.Site Selection <br /> M 9/1/2016-9/7/2016 <br /> io ! 1b. Water Quality <br /> y 9/1/2016-9/14/2016 <br /> th <br /> '^ F lc. Settling Studies <br /> ri 9/1/2016.9/14/2016 <br /> mSd.Procure and Construct <br /> 3 9/10/2016-10/15/2016 <br /> F: �!2a.Plant Add/Pilot start <br /> 10/15/2016-11/1/2016 <br /> 2b.Pilot Performance Monitoring <br /> o c I I 11/1/2016-1/1/2017 <br /> �- 2c.Report and Pres. <br /> °D C Ll 12/15/2016-12/30/2016 <br /> i 3a.Plant downselect,clarifler <br /> } 1/1/2017-1/8/2017 <br /> o, t erfof rm e-Monitoring.. - ' 1/1/2017-9/1/2017 <br /> 3d.Pilot Stop,Disassemble)9/1/2017-9/8/2017 <br /> a, E, <br /> a 3e.Data Analysis and Report 9/8/2017.10/8/2017 <br /> - twi 110/8/2017- <br /> 'LL 4a.Preliminary Full Scale Design and Report <br /> c _ 11/8/2017 <br /> E a;= i <br /> ' Day 1 i 63 125 187 249 311 373 2017 <br /> 1©9/1/2016 > � <br /> 1/1/2017 9/1/2017 <br /> 11 Pilot Field <br /> Project Start Plant Downselect Operations End 11/8/2017 <br /> >P <br /> Optimized Pilot Field <br /> 10i o/15f F/ield 2016 Operations Start <br /> Operation Start Prelim.Full <br /> Scale Design <br />