Laserfiche WebLink
REI Proposal No.P16TPA-011 <br /> August 2,2016 <br /> Page 2 <br /> window repairs outlined in the document"Envelope Condition Assessment for IRC Health <br /> Department", dated August 28,2015, will be included in the technical specifications. <br /> F. Issue preliminary Contract Documents for Owner review. Upon acceptance,final Contract <br /> Documents will be prepared and submitted. <br /> G. Provide advertisement for bids to Owner for use in advertising in accordance with <br /> applicable laws and/or submit names of three or more qualified Contractors to bid the <br /> Contract Documents. <br /> H. Hold one Pre-Bid Meeting for potential contractors to review the Contract Documents and <br /> resolve any questions that may arise during the bid stage of the project. <br /> 1. Bids shall be analyzed and a recommendation made based on low bid, alternates, <br /> contractor's past performance and Owner's budget restrictions. Submit a certified Bid <br /> Tabulation and recommendation for award. <br /> H. CONSTRUCTION ADMINISTRATION <br /> A. Complete Owner's recommended Form of Agreement between Owner and Contractor and <br /> submit to Owner and Contractor for acceptance. <br /> B. Issue "Notice to Proceed" with Date of Commencement and construction period <br /> established. <br /> C. Review and accept, as appropriate, shop drawings and submittals as required by the <br /> Contract Documents. Return unacceptable submittals to contractor as required until <br /> compliance with specifications is realized. <br /> D. Hold a pre-construction meeting with the successful contractor to ensure a clear <br /> understanding of the plans and specifications. <br /> E. Perform quality assurance site visit once every five working days,Monday through Friday, <br /> to verify work is in compliance with the Contract Documents. Photographs will be taken <br /> as deemed necessary for documentation. REI cannot comment on work that takes place <br /> and covered while REI is not onsite. <br /> F. Prepare and submit reports from each quality assurance site visit relaying information <br /> pertaining to weather, area worked, application methods, material types installed during <br /> the site visit, and listing of non-conforming items requiring Contractor's correction. <br /> G. Certify Contractor's monthly invoicing based on status of work performed as determined <br /> from project site visits. <br /> H. Route any change orders developed to address changes to the contract requirements. <br /> 1. Upon notification by the contractor that the job is substantially complete, a substantial <br /> completion inspection will be conducted with REI, Owner, Contractor and Manufacturer <br /> personnel. A punch list will be prepared to list any minor items that require further <br /> treatment. <br />