My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-124
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 1:42:51 PM
Creation date
8/22/2016 1:42:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2016
Control Number
2016-124
Agenda Item Number
8.KK.
Entity Name
REI Engineers, Inc.
Subject
Work Order No. 3
Design and replacement of Health Dept. roof
Area
1900 27th St.
Bid Number
2016050
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IREIProposal No.P16TPA-011 <br /> August 2,2016 <br /> Page 3 <br /> J. Upon notification by the contractor that the job is fully complete,a final inspection will be <br /> conducted with REI, contractor and Owner personnel. A final inspection report will be <br /> submitted upon verifying completion or if necessary, an additional punch list will be <br /> prepared. <br /> K. Upon completion of work,verify compliance of warranties,close out documents,and final <br /> billing,before forwarding to the Owner. <br /> M. PROPOSED SCOPE OF WORK <br /> A. Remove existing roof system down to the existing steel (Sectors D &H) and lightweight <br /> insulating concrete deck and provide new roof system along with sheet metal flashing and <br /> accessories to provide a complete, watertight, 20-year warrantable roof assembly. Roof <br /> system selected will be submitted to Owner for approval. <br /> B. Perform window/glazing and stucco wall repairs as outlined in REI's Report "Envelope <br /> Condition Assessment for IRC Health Department"dated August 28, 2015. <br /> IV. ENGINEERING FEES <br /> A. Based on the anticipated scope of work for this project, the proposed engineering fees are: <br /> Contract Review Documents........................................................................$8,950 <br /> Contract Final Documents............................................................................$6,350 <br /> BiddingPhase...............................................................................................$1,500 <br /> Construction Administration.......................................................................$10,100 <br /> Closeout........................................................................................................$1,500 <br /> TotalEngineering Budget.....................................................................................$28,400 <br /> V. PROJECT SCHEDULE <br /> A. Preliminary Contract Documents shall be completed within 60 days of Notice to Proceed. <br /> Final Contract Documents shall be completed and sealed within 10 days of receipt of <br /> comments. <br /> B. Construction Administration shall be performed during the estimated construction duration <br /> and the project closeout process. This work is expected to take 75 calendar days. <br /> If this proposal meets with your approval,please notify us in writing. This proposal will remain firm for a <br /> period of thirty (30) days. After that time, we reserve the right to review scheduled commitments and <br /> prices. <br /> If you have any questions regarding this matter,please do not hesitate to call. <br /> Respectfully submitted, <br /> REI Engineers <br /> Randy Moore Jr., EI Kenneth Tyner,PE,RRC <br /> Project Manager Executive Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.