Laserfiche WebLink
ORDINANCE 2009- 013 <br />exempted under 913.09(5)(b)2.c. Internal sidewalks are not required around the <br />circumference of roadway cul-de-sac circles. Where sidewalks are required along a <br />roadway which terminates in a cul-de-sac and sidewalks following the circumference of <br />the cul-de-sac circle are not proposed, the sidewalks shall terminate into the cul-de-sac <br />circle pavement utilizing a design approved by the public works director or the director's <br />appointed designee. <br />5 Function • Be designed to provide pedestrian access from residences to common <br />recreation/community areas and to the public sidewalk system external to the <br />proiect Where a proiect's internal sidewalk system is designed to connect to the <br />external public sidewalk system through an adiacent proiect, the applicant for the <br />"dependent" proiect shall coordinate with the applicant/owner of the adiacent <br />proiect to ensure that the design and construction of the sidewalk system inter- <br />connection is properly coordinated and accurately reflected on the proiect's land <br />development permit drawings. <br />(b) Provision. The developer shall be required to provide for construction of a required sidewalk <br />segments{s) in eemplianee with the fellewing fnetheds, as approved by the publie works dir-eetef <br />the d is appointed desigiiee as follows: <br />Sidewalk segments(s) along ther-eughfaf Thoroughfare Plan roadways. <br />a. Exemptions. <br />The developer is exempted from providing a sidewalk segment(s) along an <br />unpaved thoroughfare plan roadway if the roadway is not scheduled for <br />improvement on the county's 20 -year roadway improvements plan <br />schedule. <br />ii. The developer may be exempted from providing a Thoroughfare Plan <br />sidewalk segment(s) by obtaining a determination from the public works <br />and community development directors that the need for a sidewalk <br />segment(s) along the adjacent thoroughfare plan roadway is precluded by <br />physical or design constraints. <br />b. Method. When required to construct or provide a required Thoroughfare plan <br />roadway sidewalk segment(s), the developer shall: <br />i. Construct the required sidewalk segment(s) if the roadway and <br />corresponding sidewalk segment(s) are designated as a primary pedestrian <br />corridor and if construction can satisfy the design and safety criteria of <br />subsection 914.15(6)(a), as determined by the public works director or the <br />director's appointed designee. As an alternative, the developer may delay <br />construction by. "bonding -out for construction" of the segment(s) as <br />described in subsection 914.15(6)(b)l.c. as approved by the public <br />works director; or <br />ii. Transfer to the county the obligation to construct the required sidewalk <br />segment(s) by providing a cash payment of funds equal to one hundred <br />Bold Underline: Additions to Ordinance <br />Stfike through:: Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2009\EO 2009-_ 913 - 914 sidewalks.RTF <br />