Laserfiche WebLink
ORDINANCE 2009-013 <br />(100) percent of the estimated cost to construct the required sidewalk <br />segment(s) and executing an agreement for the transfer of responsibility <br />for required improvements. <br />The developer shall be responsible for clearing and grading the intended location of the <br />required sidewalk segment(s) at the time clearing and grading for the development <br />project is performed. The value of such clearing and grading shall be reflected in the cash <br />payment amount provided by the developer. The cleared path shall be approved by the <br />public works department and shall be selected so as to maximize tree preservation while <br />maintaining compliance with the sidewalk design specifications listed in subsection <br />914.15(6)(a). <br />C. Timing. The developer shall be responsible for providing the required <br />Thoroughfare Plan roadway sidewalk segment(s) in compliance with <br />subsection 914.15(6)(b)l.b.i. or ii. prior to receiving an equivalent certificate of <br />occupancy for the project. However -,-+In the event that the developer is required <br />to construct the required sidewalk segment(s) (subsection 914.15(6)(b)l.b.i.), the <br />developer may delay construction of the required sidewalk segment(s) for a <br />period of two (2) years beyond the final plat approval date of the corresponding <br />subdivision development. In electing to bond -out for construction, the developer <br />shall provide a completed contract for construction for remaining required <br />sidewalk improvements and post security to guarantee the completed contract in <br />conformance with subsection 913.10(1) construction security requirements. <br />The developer shall have the ability to extend the contract for construction and <br />posted security for a period of two (2) years, in addition to the original two (2) <br />years, upon approval of both the public works director and the community <br />development director. <br />2. Sidewalk Internal sidewalk segments(} along local roadways. <br />a. Responsibility <br />The developer shall be responsible for providing internal sidewalks along <br />internal project roadways adiacent to proiect entrances and common areas. <br />These developer -provided sidewalks shall be depicted on the approved <br />proiect preliminary plat and land development permit. <br />The builder/lot owner shall be responsible for providing the sidewalk <br />required along his lot's street frontage, as depicted on the approved proiect <br />preliminary plat and land development permit. The sidewalk segment shall <br />be constructed and inspected prior to the issuance of a Certificate of <br />Occupancy (C O) for the residence(s) on the builder's/lot owner's lot. <br />b. Multiple phase projects <br />In addition to the requirements of 913.09(5)(b)2.a., above, the following <br />requirements shall apply to multiple phase proiects that are under unified <br />control If a subdivision consists of multiple phases that are under unified <br />control, sidewalks must be completed on ninety percent (90%) of the lots in <br />Bold Underline: Additions to Ordinance 9 <br />Strike thio g="r Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2009\EO 2009-_ 913 - 914 sidewalks.RTF <br />