My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-129M
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-129M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2017 12:20:07 PM
Creation date
9/16/2016 9:44:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/16/2016
Control Number
2016-129M
Agenda Item Number
8.UU.
Entity Name
Precision Contracting Services
Subject
Upgrades Existing Security Camera Systems
Area
Wastewater Treatment Facilities Utilities Operations Center
Bid Number
2016049
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Water Utility Department Security Camera System Improvement Project <br /> Operations Center <br /> NemUnit Bid Total Bid <br /> Number OP Censer IRC rca <br /> ' tion Qwrnt' UM Price Price <br /> Ol NVR Server G"lr ion <br /> 94.NP504-16A 0 EA $2,595.00 $0.00 <br /> 72-AR121001 0 EA 5645.00 50.00 <br /> 72-HDUB-001 0 EA 5695.00 $OAO <br /> I 02 KERI Software fanfigunti KERI 0 EA $97500 $0001 <br /> 03 lab, Elettronk Tedmkian/Programming labor rate 0 HR $0.00 $0.00 <br /> S,tibly trained and credentialed labor to install electronic eq,pment and <br /> to perform programming duties and functions,inciudmg troubleshooting and warranty work <br /> 04 labor Cable Instiller labor rate 1 0 HR $0.00 50.00 <br /> Suitably trained and credentialed labor to untag cable and terminate cable <br /> OS labor Z.Instiller labor rate 0 HR $om $0.00 <br /> Suis thinedandcredentialedlaborwhssngductandcondun <br /> 06 Miscell ne,u costs-Mat Addltbnal Materials,Wrin&,Fiber,And Conduit(F&I)list line nems seperately As scary: <br /> Item al: 0 lS 50.00 $000 <br /> nem a2: 0 LS so.00 $0.00 <br /> nem P3: 0 LS so.00 $0.00 <br /> nem 44: - o Es SO.00 $000 <br /> nem as: 0 Ls 50.00 $O.00 <br /> 01 Miuellaneous costs 11,Additional Electronics(F&I)list One Items seperately As necessary: <br /> Re m 41: 0 LS $000 50.00 <br /> Item a2: 0 LS $0.00 5000 <br /> nem a3' 0 LS $0.00 so.00 <br /> I orb-total for Main Semrer Location so.00 <br /> Central WWTP location <br /> Nem Unit Bid Tptal Bid <br /> Number Central WWT Plant IRC cation Qw UM Price Price <br /> 01 NVR Server GeoVaion <br /> 94-NP504-16A 1 EA $2.595.00 $2,595.OD <br /> 72-AR121001 0 EA $645.00 $0.00 <br /> 72-HDBTB-001 1 EA $695.00 569$5.00 <br /> 02 Outdo,Cameras GeoVoion <br /> GV-BL3700 8 EA r$1,495.001 $11,960.00 <br /> 03 L25vntches GYob <br /> GV-mPOE0n811 2 EA $545.00 $1,090.00 <br /> I 04 SFP Modules G-Vnlnn <br /> GV-Lt 4 EA $50.00 5200.00 <br /> OS labor EleRronk Technkun/Programming labor me 0 HR1 $0.00 $000 <br /> Suitably trained and credentialed labor to Install electronic equipment and <br /> to perform programming duties and fue ons,including troubleshooting and warranty work <br /> 06 labor Cable Installer labor rate 1 0 HR 1 50.00 $0.00 <br /> SuinbN trained and credentialed labor to install cable and terminate cable I <br /> 07 tabor DuR Instiller labor me 0 HR $0.00 $0.00 <br /> S, <br /> bty <br /> trained and credentialed labor to install duct and cordurt <br /> 08 Miscellaneous costs Addrtbnal Materials,Wiring,And Condon(F&I) _ <br /> Item al: <br /> MLsF <br /> LssO00 $OAO <br /> ItemLS $0.00 $000 <br /> Item 43: LS 50.00 $0Item 44: LS $0.00 50.nem 45; 50.00 $0.00 <br /> I Subtotal for Central WWTP Location I $16,500.00 <br /> West WWrP location <br /> Nem Unit Bid Total Bid <br /> Number WEST WWr Plant IRC cation Qw ' UM Price Price <br /> Ol NVR Server GmVbio n <br /> 94P504- I EA $2,595.00 <br /> $2,5 <br /> .00 $2,5$0.00725 <br /> E7HD8Td1 95.00 $695.002- 0 <br /> 02 Outdoor Cameras C-V"nbn <br /> GV-BL3700 7 EA 517495.00 s10.46s.00 <br /> 03 Ll Switches GeoYmion <br /> GV-POE0811 2 EA $545.00 $1,090.00 <br /> I 03 L2 Switches C-\rbion <br /> GV-POE1611 1 EA r $745.001 $745.00 <br /> 00 SIP Modeles 6101111 n <br /> I GV{C 6 EA $50.00 5300.00 <br /> OS labor Electronic Terhnkun/programming labor nue 0 HR $50.00 $0.00) <br /> S,tibly trained and credenw ,led labw install electronic equipment and <br /> to perform pragnmming duties aM fu-,inchding troubleshooting and wannn y work <br /> Lab.06 labCable Instiller labor rate 0 HR $000 $0.00 <br /> spitibly trained and creeenwled lab,to rung cable and terminate cable <br /> 07 tabor Duct Her labor me 0 HR $0.00 50.01)I <br /> Su cably trained and credentialed lab,to Instal d=and mndun <br /> OB Ml,ell n-costs Additional Matenian,Wiring,And Conduit(F&1) <br /> Item P1: MLS� $000. 50.00 <br /> Item 42: LS $0.00 $0.Item 43LS 5003 $0.03 <br /> LS $0.00 $ow <br /> LS $0.00 $0.00 <br /> I Sub-=l 1,Central WWTP Location ) $15,890.00 <br /> Appendix A 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.