Laserfiche WebLink
Indian River County Water Utility Department Security Camera System Improvement Project <br /> Operations Center <br /> NemUnit Bid Total Bid <br /> Number OP Censer IRC rca <br /> ' tion Qwrnt' UM Price Price <br /> Ol NVR Server G"lr ion <br /> 94.NP504-16A 0 EA $2,595.00 $0.00 <br /> 72-AR121001 0 EA 5645.00 50.00 <br /> 72-HDUB-001 0 EA 5695.00 $OAO <br /> I 02 KERI Software fanfigunti KERI 0 EA $97500 $0001 <br /> 03 lab, Elettronk Tedmkian/Programming labor rate 0 HR $0.00 $0.00 <br /> S,tibly trained and credentialed labor to install electronic eq,pment and <br /> to perform programming duties and functions,inciudmg troubleshooting and warranty work <br /> 04 labor Cable Instiller labor rate 1 0 HR $0.00 50.00 <br /> Suitably trained and credentialed labor to untag cable and terminate cable <br /> OS labor Z.Instiller labor rate 0 HR $om $0.00 <br /> Suis thinedandcredentialedlaborwhssngductandcondun <br /> 06 Miscell ne,u costs-Mat Addltbnal Materials,Wrin&,Fiber,And Conduit(F&I)list line nems seperately As scary: <br /> Item al: 0 lS 50.00 $000 <br /> nem a2: 0 LS so.00 $0.00 <br /> nem P3: 0 LS so.00 $0.00 <br /> nem 44: - o Es SO.00 $000 <br /> nem as: 0 Ls 50.00 $O.00 <br /> 01 Miuellaneous costs 11,Additional Electronics(F&I)list One Items seperately As necessary: <br /> Re m 41: 0 LS $000 50.00 <br /> Item a2: 0 LS $0.00 5000 <br /> nem a3' 0 LS $0.00 so.00 <br /> I orb-total for Main Semrer Location so.00 <br /> Central WWTP location <br /> Nem Unit Bid Tptal Bid <br /> Number Central WWT Plant IRC cation Qw UM Price Price <br /> 01 NVR Server GeoVaion <br /> 94-NP504-16A 1 EA $2.595.00 $2,595.OD <br /> 72-AR121001 0 EA $645.00 $0.00 <br /> 72-HDBTB-001 1 EA $695.00 569$5.00 <br /> 02 Outdo,Cameras GeoVoion <br /> GV-BL3700 8 EA r$1,495.001 $11,960.00 <br /> 03 L25vntches GYob <br /> GV-mPOE0n811 2 EA $545.00 $1,090.00 <br /> I 04 SFP Modules G-Vnlnn <br /> GV-Lt 4 EA $50.00 5200.00 <br /> OS labor EleRronk Technkun/Programming labor me 0 HR1 $0.00 $000 <br /> Suitably trained and credentialed labor to Install electronic equipment and <br /> to perform programming duties and fue ons,including troubleshooting and warranty work <br /> 06 labor Cable Installer labor rate 1 0 HR 1 50.00 $0.00 <br /> SuinbN trained and credentialed labor to install cable and terminate cable I <br /> 07 tabor DuR Instiller labor me 0 HR $0.00 $0.00 <br /> S, <br /> bty <br /> trained and credentialed labor to install duct and cordurt <br /> 08 Miscellaneous costs Addrtbnal Materials,Wiring,And Condon(F&I) _ <br /> Item al: <br /> MLsF <br /> LssO00 $OAO <br /> ItemLS $0.00 $000 <br /> Item 43: LS 50.00 $0Item 44: LS $0.00 50.nem 45; 50.00 $0.00 <br /> I Subtotal for Central WWTP Location I $16,500.00 <br /> West WWrP location <br /> Nem Unit Bid Total Bid <br /> Number WEST WWr Plant IRC cation Qw ' UM Price Price <br /> Ol NVR Server GmVbio n <br /> 94P504- I EA $2,595.00 <br /> $2,5 <br /> .00 $2,5$0.00725 <br /> E7HD8Td1 95.00 $695.002- 0 <br /> 02 Outdoor Cameras C-V"nbn <br /> GV-BL3700 7 EA 517495.00 s10.46s.00 <br /> 03 Ll Switches GeoYmion <br /> GV-POE0811 2 EA $545.00 $1,090.00 <br /> I 03 L2 Switches C-\rbion <br /> GV-POE1611 1 EA r $745.001 $745.00 <br /> 00 SIP Modeles 6101111 n <br /> I GV{C 6 EA $50.00 5300.00 <br /> OS labor Electronic Terhnkun/programming labor nue 0 HR $50.00 $0.00) <br /> S,tibly trained and credenw ,led labw install electronic equipment and <br /> to perform pragnmming duties aM fu-,inchding troubleshooting and wannn y work <br /> Lab.06 labCable Instiller labor rate 0 HR $000 $0.00 <br /> spitibly trained and creeenwled lab,to rung cable and terminate cable <br /> 07 tabor Duct Her labor me 0 HR $0.00 50.01)I <br /> Su cably trained and credentialed lab,to Instal d=and mndun <br /> OB Ml,ell n-costs Additional Matenian,Wiring,And Conduit(F&1) <br /> Item P1: MLS� $000. 50.00 <br /> Item 42: LS $0.00 $0.Item 43LS 5003 $0.03 <br /> LS $0.00 $ow <br /> LS $0.00 $0.00 <br /> I Sub-=l 1,Central WWTP Location ) $15,890.00 <br /> Appendix A 1/2 <br />