Laserfiche WebLink
South WWTP Location <br /> nem Unit Bid total Bid <br /> Number South VVWi Plant IRC 'rcation Qwmi UM Price Price <br /> 01 NVR Server G-Vniun <br /> 94 P504-16A1 EA $2.595.00 $2,595.00 <br /> 72-AR1110(11 0 EA 56e5.00 $0.00 <br /> 72-HDSTB-0O1 1 EA $695.00 $695.00 <br /> 02 Outdoor Camttaz G-Vism 4 <br /> GV-BL3700 6 EA $149500 $8,970.00 I <br /> I 03 L]$vetches GGV-POeoYnbn <br /> E0811 2 EA $Sa5.00 $1,090.00 I <br /> 04 SEP Modules G-Vis n <br /> GV-Lc a EA Sso.00 Sxo0.00I <br /> OS labor Elenronk Technklan/programming labor me 0 MR $0.00 $0.00 <br /> Suitably trained and aedentialed labor to install electronic equipment and <br /> to perform programming duties and functions,including troubleshooting and warranty work <br /> 06 labor cable lnsoller labor rate 1 0 HR 1 $0.00 $0.00 <br /> Suably tramed and credentialed tabor to install cable and terminate cable <br /> 01 labor Dun Installer labor rate 0 HR $0.00 $0.00 <br /> Sunab trained and credentialed labor to install duct and conduit <br /> OB Miscellaneous costs Additional Materials,Winng,And Conduh(W) <br /> Item al: �00- <br /> Ls so.00 <br /> nem a2: LS $0.00 50.00 <br /> Rem p3: Ls $0.00 $000 <br /> Item all: LS $0.00 $000 <br /> Item R5: Ls s0.00 $0.00 <br /> I Sb--t far Central W WIP Location f $33,550.00 <br /> Maintenance Services _ This Item is not Included In the Project Tool <br /> nem Unit Bid Total Bid <br /> Number Description IRC specification Quantity UM Price Price <br /> Ol Additional Maintenance GeaV,- I LS $0.00 50.001 <br /> Indicate length of initial warranty on the eqove <br /> equipment listed abI` <br /> list any additional maintenance provided for hardware indicated above <br /> 02 Annual MAlnteuance(ahe GeoYnion 1 LS $0.00 F 50.00 <br /> 03 license pack for 3rd Party GeoVisbn <br /> GV.VMS02 1LS $0-00 50.00 <br /> GV-VMS-0a 1 Ls $0.00 $0.00 <br /> GV-VMS-06 1 LS $0-00 50.00 <br /> GV.VMs-w 1 Ls $0.00 s0.00 <br /> GV-VMS-10 1 LS $0.00 $0.00 <br /> GV-VMS-12 1Ls $0.00 soon <br /> GV-VMS-16 1 LS $0.00 $0.00 <br /> I Subtotal for Maintenancii Servkes j $0.00 <br /> Engineering Services_ This Item Is not included in the Project Total 1I� <br /> nem Unit Bid Total Bid <br /> Number Description IRC Specification Quantity UM Price Rice <br /> 03 Engmeen ig Sward Mapp Engineered Drawings of ALL communications cabim 1 LS 1 $0.00 50.00�. <br /> 02 Engineering ROW Design Design Drawings of ALL communications routes 1 Ls sao0 s0.00 <br /> �{ 03 Engineering Electronics A Asbulh Drawings of ALL equipment locations 1 Ls $0.00 so.00 <br /> Oa Engmeering GPS(of Equi{GPS location indicated on dravengs listed above 1 is $0.00 $0.00 f <br /> I Sub-total for Engineering Services j $0.00 <br /> Grand Totals $45,980.00 $0.00 <br /> Appendix A 2/2 <br /> t I <br />