My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/24/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/24/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:36:28 PM
Creation date
9/29/2016 10:09:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/24/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quantities had previously been computed for the section from SR 60 to north of 57' Street. The <br />quantities will now be adjusted to include only the section from North of 49b Street to north of <br />57'h Street. <br />The plans will be modified to show the previously constructed transition section north of 49`x' <br />Street, and to show the work necessary within the transition area for the final 4 -lane roadway. <br />Additionally, the intersection of 57`h Street and the bridge over the IRFWCD Lateral A canal has <br />been widened to a three lane section. The plans will be modified to show the connection to the <br />widened bridge and to eliminate the work shown east of the Lateral A Canal. Survvey <br />information will be obtained within the transition area and at 57`h Street to verify the existing <br />conditions. <br />The plans for the bridges at 53'd Street, the North relief canal, and 57h Street will be updated to <br />conform to the current design criteria. The landscape and irrigation plans will be updated and <br />will be revised to include only the area from north of 49`h Street to north of 59`h Street. <br />The work included in Amendment No. 16 is in accordance with the existing AGREEMENT <br />dated November 6, 2005 between ARCADIS US, Inc. (ENGINEER) and Indian River County <br />(COUNTY). <br />"SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br />30% and 60%, and 90% plans have been submitted to the County. Engineer will prepare revised <br />90%, and 100% plans. The plan modifications will consist of the following: <br />The Roadway set of plans shall consist of the following: <br />Page 2 of 6 <br />G \LNR Support\Proposa1s\WPB\2016\66th Avenue\66th Avenue AVE AMENDMENT 4-25-16.doc <br />P:3 <br />30% <br />60% <br />90% <br />100% <br />Cover Sheet <br />X <br />X <br />Drainage Maps <br />X <br />X <br />Typical Sections <br />X <br />X <br />Summary of Quantities <br />X <br />X <br />Summary of Drainage Structures <br />X <br />X <br />Reference Ties <br />X <br />X <br />General Notes <br />X <br />X <br />Details <br />X <br />X <br />Plan and Profile Sheets (40 scale) <br />X <br />X <br />Page 2 of 6 <br />G \LNR Support\Proposa1s\WPB\2016\66th Avenue\66th Avenue AVE AMENDMENT 4-25-16.doc <br />P:3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.