Laserfiche WebLink
Side Street Plan and Profile Sheets <br />X <br />X <br />Cross Sections at 100 ft interval <br />X <br />X <br />Signage & Pavement Marking Plans (40 scale) <br />X <br />X <br />Plateau Plan and Profile Sheets <br />X <br />X <br />Drainage Structure Sheets <br />X <br />X <br />Detention Areas & Details <br />X <br />X <br />Driveway Cross Sections <br />X <br />X <br />Cross Sections <br />X <br />X <br />Side Street Cross Sections <br />X <br />X <br />Stormwater Pollution Prevention Plans (SWPPP) <br />X <br />X <br />Signing and Pavement Marking Plans <br />X <br />X <br />Bridge Plans <br />X <br />X <br />Landscape Plans <br />X <br />X <br />Irrigation Plans <br />X <br />X <br />Computation Book <br />X <br />X <br />Construction Cost Estimate and Quantities <br />X <br />X <br />"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br />Project shall be completed as follows: <br />a. The time for completion of the 90% design drawings, permit applications, and <br />Engineer's Opinion of Probable Construction Cost for the project shall be.four <br />(4) months from the date of execution of this ADDENDUM. Once permits <br />are received, 100% design drawings shall be completed one month (1) month <br />thereafter. <br />2. Deliverables -The ENGINEER shall provide the COUNTY: <br />a. Three (3) 11" x 17" paper signed and sealed of the 90% plans. Also, a pdf <br />format set of the plans on a cd. <br />b. Microstation drawing file and PDF formats on CD. <br />c. Work Product shall be prepared and supplied in State Plane geometry (NAD83 <br />2007 adjustment if applicable); digital versions are to be prepared and <br />submitted so that the COUNTY or other consultants can readily use it for the <br />design and analysis of the area, as defined. It shall contain all information <br />necessary for third -party surveyor to independently recreate and/or utilize the <br />survey work. It is acknowledged all final products become property of Indian <br />River COUNTY and will be available for use by the public at large. <br />Page 3 of 6 <br />G:\LNR Support\Proposa1s\WPB\2016\66th Avenue\66th Avenue AVE AMENDMENT 4-25-16.doc <br />29 <br />