My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/24/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/24/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:36:28 PM
Creation date
9/29/2016 10:09:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/24/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"SECTION V — COMPENSATION" is being modified to incorporate the following: <br />The COUNTY agrees to pay and the ENGINEER or agrees to accept for services <br />rendered pursuant to this Agreement fees in accordance with the following: <br />A. Professional Services Fee <br />1. The basic compensation mutually agreed upon by the ENGINEER and the <br />COUNTY follows: <br />The following is a summary of costs: <br />Charge Associated with <br />Change in Project Scope New Total <br />And Proiect Limits Compensation <br />Geotechnical Services (Tierra)(Lump Sum) ................................ $0.00 $139,460.00 <br />Engineering (ARCADIS) (Lump Sum) ................................. $24,834.66 $988,222.16 <br />Signal Plans (ARCADIS)................................................................ $0.00 $84,726.66 <br />Design Survey (60 Avenue)(ARCADIS)................................ $3,577.00 $173,077.00 <br />Design Survey (Sidestreets)(ARCADIS)......................................... $0.00 $71,428.00 <br />Right -of -Way Survey and Map (60 Avenue) ................................. $0.00 $117,821.00 <br />Right-of-way Survey (Sidestreets).................................................... $0.00 $61,963.00 <br />Structural Design for 3 bridges <br />(BDA, now the Wantman Group, Inc) ................................... $19,400.00 $226,622.00 <br />Landscape & Irrigation........................................................... $23,500.00 $100,660.00 <br />(Thomas Lucido & Associates) (Lump Sum) <br />PondSurveys..................................................................................... $0.00 $25,790.00 <br />Water Main Plans (ARCADIS)................................ $0.00 $86,145.00 <br />..................... <br />(Lump Sum) <br />Corridor Study(ARCADIS)...........................................................$0.00 $15,581.00 <br />Cultural Resource Assessment ......................................................$0.00 $8,925.93 <br />TOTAL PROFESSIONAL SERVICES ................................. $71,311.66 $2,100,421.75 <br />Page 4 of 6 <br />C:\Users\jwilliams\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\DA3K8007\66th <br />Avenue AVE AMENDMENT 5-16-16.doc <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.