Laserfiche WebLink
HOURLYRATE ALLOWANCES <br />Allowance for Sketch and Legal <br />Descriptions and staking ofparcels (3 75. 001each) ................ NTE $0.00 $51,000.00 <br />Allowance for miscellaneous roadway design <br />changes due to right of way negotiations ............................... NTE $0.00 $20,000.00 <br />Allowance for Survey Crew and Soft Dig <br />Machine for Horizontal and Vertical <br />Utility Locations at Potential Conflicts <br />(Survey $112/Hr)...................................................................... NTE $0.00 $20,000.00 <br />Allowance for Survey and Design <br />Of a transition to match the existing pavement <br />At the north end of the project ................................................ NTE $0.00 $27,000.00 <br />Construction Engineering Services - Public. Works ............. NTE $0.00 $92,877.12 <br />Construction Engineering Services -Utility Dept .................. NTE $0.00 $10,446.24 <br />Construction Engineering Services -Structural Engineer. NTE $920.00 $920.00 <br />TOTAL HOURLYRA TE ALLO WANCES ....................... NTE $920.00 $222,243.36 <br />Compensation for the hourly rate allowances will be made on an hourly basis at the <br />hourly rates listed below: <br />Project Engineer Manager .............................................. $146.64 <br />ProjectEngineer............................................................... $109.70 <br />SeniorCADD Operator...................................................... $85.84 <br />CaddDraftsman.................................................................. $56.89 <br />Survey Project Manager ................................................... $106.40 <br />ProfessionalSurveyor........................................................ $98.30 <br />SurveyCADD Tech............................................................ $68.17 <br />3 Man Field Crew............................................................. $126.84 <br />2 Man Field Crew............................................................. $114.14 <br />Sr. Field Coordinator......................................................... $75.00 <br />The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the <br />AGREEMENT shall remain in full force and effect and are incorporated herein. <br />Page 5 of 6 <br />G:\LNR Support\Proposals\WPB\2016\66th Avenue\66th Avenue AVE AMENDMENT 4-25-16.doc <br />31 <br />