My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/14/2016
CBCC
>
Meetings
>
2010's
>
2016
>
06/14/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:18:39 PM
Creation date
9/29/2016 10:56:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/14/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAMENERO LAKE ESTATES ASPHALT MILLINGS PROJECT (PHASE II) <br />I.R.C. PROJECT NO. 1317 BID NO. 2015039 <br />:Item.No <br />Desch <br />untu.0(janft <br />Unft Price <br />Price Increase <br />Prlce.Deerease <br />283-1A <br />ASPHALT MILLINGS 6" SUBGRADE LBR40 SHOULDER <br />SY <br />630 <br />6.50 <br />4,097.21 <br />430-174-112A <br />PIPE CULVERT 12' ACMP <br />LF <br />230 <br />25.00 <br />5,750.00 <br />430-984-121 <br />MITERED END SECTION 12 ACMP <br />EA <br />7 <br />525.00 <br />3,675.00 <br />700-20-40 <br />SINGLE POST SIGN STOP RELOCATE <br />EA <br />21 <br />180.00 <br />3.780.00 <br />110-7-1 <br />MAIBOX RELOCATE <br />EA <br />31 <br />60.00 <br />1.860.00 <br />570-1-2 <br />PERFORMANCE TURF - SOD (BAHIA) (INCLUDES: TOP SOIL, <br />FERTILIZER AND WATERING) <br />SY <br />15,209 <br />1.75 <br />26 615.75 <br />WCD 1 <br />REVISE ELEVATIONS <br />LS <br />1 <br />1,900.00 <br />1,900.00 <br />WCD 2 <br />12" ACMP N/S 85TH ST <br />LS <br />1 <br />6,000.00 <br />6,000.00 <br />WCD 3 <br />REDUCE 6' STABILIZED SHOULDER <br />SY <br />8,322 <br />2.00 <br />16 644.00 <br />WCD 5 <br />EXTRA GRADING <br />LF <br />2,720 <br />10.00 <br />27 200.00 <br />FORCE ACCOUNT <br />LS <br />1 <br />20 000.00 1 <br />20 000.00 <br />SUBTOTALS <br />I <br />1 <br />1 <br />63,575.75 1 <br />53,946.21 <br />VERO LAKE ESTATES ASPHALT MILLINGS (PHASE II) TOTAL INCREASE <br />$9,629.54 <br />34 <br />00310-1 <br />F:1Pub8c WorksW-NGINEERING DMSION PROJECTS11317-85th St MGGng_91st Ave to 101st AveWdmin%Change GrdeACO No. 1 Description of Itemized Changes <br />
The URL can be used to link to this page
Your browser does not support the video tag.