My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/14/2016
CBCC
>
Meetings
>
2010's
>
2016
>
06/14/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:18:39 PM
Creation date
9/29/2016 10:56:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/14/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 01 <br />DATE OF ISSUANCE: 10/21/15 EFFECTIVE DATE: 10/21/15 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida Inc. <br />Project: Vero Lake Estates Asphalt Millings Project (Phase II) <br />Project No.: 1317 <br />Bid No. 2015039 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Revise the current plan elevations to accommodate field conditions. Add 34 -feet of 12 -inch <br />pipe and two 12 -inch mitered ends to the project. <br />Purpose of Work Change Directive: <br />Inspection of the existing drainage system has revealed that proposed culvert elevations will <br />impeded the drainage system. As such, elevation changes at the attached locations and the <br />replacement of an existing pipe is necessary. <br />Attachments: List of locations were elevation changes and pipe replacement are to take place. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />X Unit Prices <br />II Lump Sum <br />❑ Other. <br />❑ By Change Order. <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />Q Other: <br />❑ By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$1900.00 Substantial Completion: 0 days; <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTERECOMMENDED: APPROVED: <br />By: By: WZEI;?�e <br />CON OR (Signature EN INE R (Signature) OWNEq (Signature) <br />Date: /O Date: (o /2 / S Date: 10 2 7 I S <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1317-85th St Milling_91 st Ave to 101 st Ave\Design\Work Change <br />Directives\WCD #111317 - WCD #1 to Dickerson 102015.doc <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.