Laserfiche WebLink
.a <br />SECTION 00948 - Work Change Directive <br />DATE OF ISSUANCE: 5/2/2016 <br />OWNER: Indian River Count( <br />CONTRACTOR: Dickerson Florida Inc. <br />Project: Vero Lake Estates Asphalt Millings Protect (Phase 11) <br />Project No.: 1317 <br />Bid No. 2016039 <br />You are directed to proceed promptly with the following changes: <br />No. 05 <br />EFFECTIVE DATE: 5/2/2016 <br />Description: <br />Perform additional swale grading as necessary to ensure proper drainage. <br />Purpose of Work Change Directive: <br />The construction drawings did not take into account the necessity to regrade the drainage swales <br />along some sections of the roadway's due to the installation of millings and shoulders. As such <br />additional grading was required. <br />Attachments: Dickerson Letter dated April 1, 2016 outlining additional grading that was necessary. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />_ Unit Prices <br />Lump Sum <br />Other <br />— <br />0 By Change Order. <br />Method of determining change in <br />Contract Times <br />Contractor's Records <br />Q Engineer's Records <br />Q Other. <br />By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) In Contract Times: <br />Change Directive <br />$27.200.00 Substantial Completion: 2.days; <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion: 0 days. <br />If the change involves an Increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED'RECOMMENDED: <br />B�.—A 0 <br />By: �i <br />APPROVED: <br />;��e <br />- <br />, <br />By: <br />CON R (Signature) <br />ENGINEER (Signature) <br />OWNr=R (Signature) <br />5 <br />Date: S� <br />-s l zDate: <br />Date: <br />* * END OF SECTION * * <br />F:1PuhHc Works1ENGINEERING DIVISION PROJECTS11317-85th St N ilGng_91stAve to 101st AvaV)esign1Work Change <br />Dked ywMCD #511317 - WCD #5 to Dickerson 050201S.doc <br />42 <br />