My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
06/21/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:27:11 PM
Creation date
9/29/2016 11:15:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/21/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 2 <br />DATE OF ISSUANCE: 10-2715 EFFECTIVE DATE: 11-4-15 <br />OWNER: Indian River County <br />CONTRACTOR: Guettler Brothers Construction LLC <br />Project: Aviation Boulevard/20"' Avenue Intersection Improvements <br />OWNER's Project No. 1422 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Modify the top of the IRFWCD Main Canal bank on the northeast and northwest side of the <br />20th Avenue Bridge at Aviation Boulevard by removing the existing rock rubble, Import and <br />place suitable soil material to bring the top of bank up to where the ground slope is away <br />from the canal, and replace the rock rubble. <br />Purpose of Work Change Directive: <br />Provide level ground for maintenance equipment,near the top of IRFWCD Main Canal bank <br />on the northeast and northwest side of the 20th Avenue Bridge at Aviation Boulevard. . <br />Attachments: (List documents supporting change) <br />Unit Price Proposal from Guettler Brothers Construction LLC, dated 1.0/19/15 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />0 Unit Prices <br />❑ Lump Sum <br />Other. <br />By Change Order. <br />Estimated Increase of this Work Change Directive <br />$7,882.88 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in <br />Contract Times <br />Q Contractor's Records <br />❑ Engineer's Records <br />[j Other <br />f By Change Order. <br />Estimated increase (decrease) In Contract <br />Times: NONE <br />Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMEND D: <br />APPROVED: <br />B <br />B ` <br />By:� <br />. <br />l w <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signa re) <br />Date: HA/1.5 <br />I <br />IDate: /t— S - / S' <br />I <br />Date: 9 <br />PTublic WorkMENGINEERING DIVISION PROJECTS71422 Avlation Blvd -20th Avenue Intersection ImprovementslAdmimlWork <br />Change DIr100948 - Work Change DlrecUve No. 2.doc <br />110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.