My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
06/21/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:27:11 PM
Creation date
9/29/2016 11:15:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/21/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 4 <br />DATE OF ISSUANCE: 12-11-15 EFFECTIVE DATE: 12-11-15 <br />OWNER: Indian River County <br />CONTRACTOR: Guettler Brothers Construction LLC <br />Project: Aviation Boulevard/200 Avenue Intersection Improvements <br />OWNER's Project No. 1422 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Provide a 60 day time extension to the Substantial and Final contract completion date. <br />Purpose of Work Change Directive: <br />Provide a 60 day time extension to the Substantial and Final contract completion date <br />extending the dates indicated in the Notice to Proceed to allow time to address issues with <br />the signal drilled shafts. <br />Attachments: (List.documents supporting change) <br />Letter -from Guettler Brothers Construction LLC, dated 12/1/15 requesting a time extension <br />to the contract time. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change, Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />NONE <br />0 Unit Prices <br />Q Lump Sum <br />II Other. <br />Q By Change Order. <br />No Increase in Contract Price <br />Method of determining change in <br />Contract Times <br />Q Contractor's Records <br />El Engineer's Records <br />JKOther.' TIme.extension request by Contractor <br />By Change Order. <br />Estimated Incxease In Contract <br />Times: 60 Days <br />Substantial Completion: 60 days. March 8 2016 <br />Ready for Final Coinoletion• 60 days Adrll 7 2016 <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By. <br />BY'Z,,; „ <br />By: 41 X-,fAl <br />CO CTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: / /$ <br />Date: r bt r 1 � <br />Date: L I� �/ <br />F:1Public Works\ENGINEERING DIVISION PROJECTS11422 Aviation Blvd -20th Avenue Intersection ImprovementsWdmimlWork <br />Change DG100948 - Work Change Directive No. 4.doc <br />116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.