Laserfiche WebLink
Page 6 of 7 <br />Fellsmere Road Maintenance Workshop <br />For June 27, 2016 <br />The table below shows the impact of an MSBU on property within the area to fund this option <br />According to available records, the area contains about 9,500 parcel acres. This would result in a charge <br />of about $18.50 per parcel acre. If the 25% contribution from the County is applied, this would reduce <br />the assessment rate to about $14.00 per parcel acre. <br />Estimated Impact — MSBU Funding for Option 3 <br />Item Description <br />Est. Annual Amount <br />Annual Operating Costs <br />$165,626 <br />5% Revenue Collection Factor <br />$8,717 <br />Gross Assessment Revenue Required <br />$174,343 <br />Estimated Number of Parcel Acres <br />9,500 <br />Estimated Charge — 100% Assessment <br />$18.50 per Parcel Acre <br />Less 25% County Contribution <br />($4.50 per Parcel Acre) <br />Est. Charge — 75% Assessment <br />$14.00 per Parcel Acre <br />Typical House Analysis <br />Assume 10 Acre Parcel <br />Typical House Estimated Ad Valorem Impact <br />$140.00 <br />Note: The table above is on estimate only. It is based upon annual estimated operating costs <br />associated with the new grader route. It does not include funding for additional material that may <br />be needed to establish a proper road base. It also does not include any funding for right of way and - <br />or easements that need to be acquired as many roadways fall partially or fully on private property. <br />Option 4: Create a Municipal Services Benefit Unit (MSBU) for qualifying individual unpaved roads: <br />• Establish a percentage of homes on a street to qualify for County Maintenance. Staff <br />recommends a percentage of 66 2/3% in keeping with the current percentage established for <br />other programs for road paving and petition millings programs. <br />• Public Works staff to evaluate qualifying unpaved roads to compile an estimated cost to <br />improve unpaved roads to acceptable public safety and maintenance levels. This includes <br />additional fill material and an analysis of stormwater runoff into the FWCD ditch system. <br />• Perform survey on all qualifying unpaved roads to establish the actual location of the existing <br />unpaved roads with respect to the available FWCD drainage right-of-way. <br />• Staff would contact property owners to obtain right-of-way from each property owner for all <br />sections of existing roadways that are outside of the FWCD right-of-way. <br />• Obtain authority from each property owner to direct stormwater runoff from the roadway onto <br />private property <br />• To ensure public safety, the application of the FDOT Manual of Uniform Minimum Standards for <br />Design, Construction, and Maintenance for Streets and Highways (Green Book Standards) to all <br />roadways that are currently not maintained by the County will be necessary. <br />C \UxrsUszpyrka\DesktuplFellsmere <br />Water Control District Roadways\Fcllsrnere Unpa%cd Road Maintenance Agenda for lune 27 2016.doc j <br />s <br />'6 <br />