My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2016 (5)
CBCC
>
Meetings
>
2010's
>
2016
>
07/12/2016 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 11:50:50 AM
Creation date
9/29/2016 11:50:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2016
Meeting Body
Board of County Commissioners
Subject
Fellsmere Roads
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> W. O. NO. 1 <br /> BRICK MANHOLE REHABILITATION PROJECT <br /> PURPOSE <br /> The purpose of this Task Order is to describe the Scope of Services for the Brick Manhole <br /> Rehabilitation Project. <br /> The overall goal of the project is successfully rehabilitate brick manholes using a structural <br /> epoxy coating system as an alternative to installation of a FRP liner system. An FRP liner <br /> system requires that the cone section be removed and replaced causing significant public <br /> disruption and added expense to the OWNER. The OWNER has selected six (6) of their worst <br /> brick manholes for this project located within the Ixora Park Subdivision. This task order <br /> includes the development of performance specifications, application services/inspection/quality <br /> control testing of the rehabilitated manholes, and a brief summary technical memorandum. <br /> ENGINEER'S SERVICES <br /> ENGINEER's services include the following three tasks to complete this assignment. These <br /> tasks are discussed in detail below. <br /> • Task 1 - Performance Specification Development <br /> • Task 2 -Application Services/Inspection/Quality Control Testing <br /> • Task 3 - Technical Memorandum <br /> TASK 1. PERFORMANCE SPECIFICATION DEVELOPMENT <br /> ENGINEER will develop a performance specification to cover the brick manhole rehabilitation <br /> utilizing a structural epoxy coating system. <br /> Deliverables by ENGINEER for OWNER review and input: <br /> • Performance specification <br /> TASK 2. APPLICATION SERVICES/INSPECTION/QUALITY CONTROL <br /> Subtask 2.1. Application Services <br /> ENGINEER has selected the application of the structural epoxy coating system based on prior <br /> successful experience rehabilitating brick manholes. ENGINEER will coordinate the application <br /> services to perform the rehabilitation of the six (6) brick 48-inch diameter manholes. The <br /> manhole locations and depth are listed below: <br /> 2534 2nd Street 10'-5" <br /> Lift Station 100 12' <br /> 2464 1st Place 9' <br /> 2184 1st Place 7' <br /> HAClientllndian River County\Contract\IRC 2016-TO2_doc 1 <br /> 31 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.