My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2016 (5)
CBCC
>
Meetings
>
2010's
>
2016
>
07/12/2016 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 11:50:50 AM
Creation date
9/29/2016 11:50:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2016
Meeting Body
Board of County Commissioners
Subject
Fellsmere Roads
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2413 2nd Street SW 8' <br /> 2413 2nd PI SW 6' <br /> Owner will be responsible for any permits and debris removal .that may be required. No permits <br /> are anticipated, since all work will be performed through the open manhole lid. <br /> Subtask 2.2. Inspection <br /> ENGINEER will perform limited on-site field inspection and train County inspectors on the steps <br /> involved with the successful rehabilitation of brick manholes. Assume three days. <br /> Subtask 2.3. Quality Control <br /> ENGINEER will observe two quality control tests during subtask 2.2. The first is a spark testing <br /> of the finished surface of each manhole to ensure that no pinholes exist. The second is <br /> adhesion tests of two of the six manholes to ensure that the minimum adhesion test requirement <br /> has been achieved. The test will be extended to failure to access the maximum adhesion that <br /> was achieved. Costs associated with this task are included in subtask 2 2. <br /> TASK 3. TECHNICAL MEMORANDUM <br /> Subtask 3.1. Draft Technical Memorandum <br /> At the completion of the manhole rehabilitation (Tasks 1 and 2), ENGINEER will produce a brief <br /> draft technical memorandum (TM) summarizing the results of the project and distribute the TM <br /> to OWNER for review and approval. <br /> Subtask 3.3. Final Technical Memorandum <br /> The ENGINEER will revise the draft TM as appropriate based on the OWNER's comments <br /> received, and submit a Final TM. <br /> Task 3 Deliverables: <br /> Draft brief TM (PDF) <br /> Final TM (PDF) <br /> TIME OF PERFORMANCE <br /> Completion of the services outlined above will be provided over the course of three months after <br /> notice to proceed. <br /> PAYMENT <br /> OWNER shall pay ENGINEER for ENGINEER's Services, as delineated above, rendered under <br /> a lump sum fee of $47,200 (Task 1- $3,125, Task 2.1- $32,175, Task 2.2- $9,260, Task 3- <br /> $2,640). <br /> H-\Client\Indian River County\Contract\IRC 2016-TO2_.doc 2 <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.