Laserfiche WebLink
Agreement <br /> Bid No. 2016031 <br /> South County Water Treatment Plant Well No. 7, Well, Wellhead and Appurtenances and <br /> South and South Oslo Road Water Treatment Plant Floridan Aquifer Wells Rehabilitation <br /> Project <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State <br /> of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br /> All Webbs Enterprises, Inc. (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br /> follows: <br /> ARTICLE 1 - WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents as <br /> set forth in Article 8 of this Contract. The Work is generally described as follows: <br /> Contractor as an independent contractor and not as an employee shall furnish and complete all of <br /> the necessary labor, material and equipment to perform the work as specified or indicated in the <br /> Contract Documents and per FDEP, the Indian River County Department of Utility Services and <br /> County Engineering Department standards. The work is generally described as follows: <br /> The proposed work generally consists of furnishing all labor, materials, tools and equipment to <br /> construct a 16-inch diameter Upper Floridan Aquifer production well to a depth of approximately 700 <br /> feet below land surface, including pump assembly, electrical panel, telemetry equipment, discharge <br /> piping (including valves, flowmeter and fittings), pedestal, housekeeping pad, and pipe supports. All <br /> work will include maintaining traffic control, complete restoration and all other appurtenant and <br /> miscellaneous related items and work for a completed project. It is the intent of the Indian River <br /> County Department of Utility Services to obtain complete and working installations under this contract <br /> and any items of labor, equipment, and materials that may reasonably be assumed as necessary to <br /> accomplish this end shall be supplied whether or not they are specifically stated herein. All work as <br /> shown on the construction plans will be done in accordance with the Indian River County Department <br /> of Utility Services Water & Wastewater Utility Standards, (December 2015) or latest edition, unless <br /> specified differently in the individual Work Authorizations or changed by the Engineer or his <br /> representative. The work is located in the South County Park directly east of the South County Water <br /> Treatment Plant on 20th Avenue, North of Oslo Road. <br /> The construction of the utility improvements described above shall also consist of, but not limited to: <br /> resetting of existing facilities disturbed during construction; utilities exploration; coordination with any <br /> permitting agencies; trenching; clearing and tree removal, dewatering; installation of pipe, structures <br /> and all appurtenances; fittings and restrainers; soil backfill compaction; testing; (including backfill and <br /> subgrade testing); road, landscape and driveway restoration; re-grading and grassing (sod); <br /> mobilization, demobilization and traffic control. No excavation shall be left open when work is not <br /> actively being performed. Construction fencing used in the work area shall not block sight distance <br /> near intersections or driveways. All construction equipment and materials shall be stored in a manner <br /> that does not disrupt park operations. <br /> Section 00530-1 <br /> 39 <br />