The Contractor is responsible for obtaining a St. Johns River Water Management District Well <br /> Construction Permit and filing the corresponding well completion report. The County has obtained the <br /> necessary Consumptive Use Permit and Florida Department of Environmental Protection Potable <br /> Water System Component Permit. <br /> ARTICLE 2 - THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be generally described as <br /> follows: <br /> Project Name: South County Water Treatment Plant Well No. 7, Well, Wellhead and <br /> Appurtenances and South Oslo Road Water Treatment Plant Floridan <br /> Aquifer Wells Rehabilitation Project <br /> Bid Number: 2016031 <br /> Project Address: South County Park, 2011 Avenue and Oslo Road. <br /> ARTICLE 3—TERM AND CONTRACT TIMES <br /> 3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 120 calendar days from effective date of Notice to Proceed, Contractor shall <br /> complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job. <br /> 3. Perform all photographic recording and documentation of conditions prior to <br /> construction: <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Mobilize all labor, equipment, and materials. <br /> 6. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> 9. Construct and equip well, complete concrete work, and install electrical and <br /> telemetry components. <br /> 10. Complete all geophysical logging and pump testing. <br /> (b) Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br /> Substantial Completion. <br /> (c) From 120 calendar days to 150 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. <br /> 3.02 Completion of all tasks outlined above(i.e., Subparagraphs a, b, and c)constitute Final <br /> Completion. <br /> 3.03 Liquidated Damages <br /> Section 00530-2 <br /> 40 <br />