My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1.1 SCOPE <br /> Furnish all labor, equipment, appliances, and materials required or necessary to <br /> clean up and restore the site after the construction is completed. <br /> 1.2 REQUIREMENTS <br /> A. During the progress of the project, keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition. Remove all rubbish, <br /> surplus materials, and unused construction equipment. Repair all <br /> damage so that the public and property owners will be inconvenienced as <br /> little as possible. <br /> B. Provide onsite containers for the collection of waste materials, debris, and <br /> rubbish and empty such containers in a legal manner when they become <br /> full. <br /> C. Where material or debris has been deposited in watercourses, ditches, <br /> gutters, drains, or catch-basins as a result of the CONTRACTOR's <br /> operations, such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work, and the ditches, <br /> channels, drains, etc., shall be kept clean and open at all times. <br /> D. Before the completion of the project, unless otherwise especially directed <br /> or permitted in writing: <br /> 1. Tear down and remove all temporary buildings and structures; <br /> 2. Remove all temporary works, tools, and machinery, or other <br /> construction equipment furnished; <br /> 3. Remove all rubbish from any grounds occupied; and <br /> 4. Leave the roads, all parts of the premises, and adjacent property <br /> affected by construction operations, in a neat and satisfactory <br /> condition. <br /> E. Restore or replace any public or private property damaged by construction <br /> work, equipment, or employees, to a condition at least equal to that <br /> existing immediately prior to the beginning of the operations. To this end, <br /> the CONTRACTOR shall restore all highway, roadside, and landscaping <br /> work within any right-of-way, platted or prescriptive. Acceptable materials, <br /> equipment, and methods shall be used for such restoration. <br /> F. Thoroughly clean all materials and equipment installed and on completion <br /> of the work, deliver the facilities undamaged and in fresh and new- <br /> appearing condition. <br /> 01710 Site Cleanup <br /> 01710-1 <br /> P\Public Works\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use FieldWdmin\bid documents\Master Contract <br /> Documents\01710-Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.