My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only <br /> those cleaning materials which will not create hazards to health or <br /> property and which will not damage the surfaces. Use cleaning materials <br /> only on those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times. <br /> I. Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR's expense, spray water or other dust control <br /> agents over the areas, which are producing the dust. Schedule <br /> construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces. <br /> 1.3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion, the OWNER, ENGINEER, and CONTRACTOR shall <br /> review the site with regards to site cleanup and restoration. Clean and/or restore <br /> all items determined to be unsatisfactory by the OWNER or ENGINEER, at no <br /> additional expense. <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use FieldWdmin\bid documents\Master Contract <br /> Documents\01710-Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.