My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br /> Environmental Planning&Code Enforcement Section <br /> 1801 27th Street,Vero Beach FL 32960 <br /> # 772-226-1249/772-978-1806 fax <br /> Icy' <br /> www.ircgov.com <br /> 5/19/2016 WIC <br /> APPLICANT: <br /> JOHN M BOYER P.E. <br /> 1655 27TH ST <br /> SUITE 2 <br /> VERO BEACH,FL 32960 <br /> INDIAN RIVER COUNTY LAND CLEARING PERMIT <br /> PROJECT NO./PERMIT NO. 91090060/76628 <br /> PROJECT NAME: SOUTH COUNTY REGIONAL PARK GENERAL USE FIELDS <br /> PROJECT DESCRIPTION: LAND CLEARING PERMIT FOR CONSTRUCTION OF GENERAL USE <br /> FIELDS <br /> PROPERTY OWNER'S NAME: RICHARD SZPYRKA P.E. <br /> LOCATION OF ACTIVITY: 1590 9TH ST SW <br /> PARCEL NUMBER 33-39-23-00001-0100-00001.0 <br /> THIS LAND CLEARING PERMIT is issued in accordance with Chapter 927 of the Indian River County Land Development Code. <br /> The above named applicant is hereby authorized to perform the herein described activity in accordance with the specifications stated <br /> herein and provided for in Chapter 927. This permit does not absolve the applicant and/or property owner from the responsibility to <br /> satisfy state or federal regulations that may apply to the activity. <br /> 1. LAND CLEARING IS NOT ALLOWED TO COMMENCE UNTIL APPROVAL (OR EXEMPTION VERIFICATION)IS <br /> OBTAINED FROM THE ST.JOHNS RIVER WATER MANAGEMENT DISTRICT (SJRWMD). If you are not sure as to the <br /> status of SJRWMD approval or exemption,contact the Palm Bay office of the SJRWMD at phone number(321)984-4940. <br /> 2. LAND CLEARING ASSOCIATED WITH SITE PLAN DEVELOPMENT (per County Code Chapter 914) OR <br /> SUBDMSION PLATTING(per County Code Chapter 913)IS NOT ALLOWED TO COMMENCE UNTIL THE SITE PLAN <br /> OR PRELIMINARY PLAT IS FORMALLY APPROVED AND, IF A LAND DEVELOPMENT PERMIT IS REQUIRED, <br /> UNTIL A LAND DEVELOPMENT PERMIT IS ISSUED BY THE COUNTY ENGINEERING DIVISION. <br /> 3. A copy of the permit shall be kept on-site during the land clearing activity. <br /> 4. The applicant shall notify county environmental planning staff upon completion of the activity,who shall inspect the property to <br /> confirm compliance which applicable county regulations. <br /> 5. Debris resulting from the land clearing activity shall be disposed of at an approved disposal facility within 60 days of clearing <br /> completion, or burned with an air curtain incinerator bum permit from the County Fire Division (or State Division of Forestry, as <br /> applicable), in accordance with County Code Chapter 925. Mulched land clearing material may be integrated with clean fill to <br /> augment berms and stormwater retention areas.Mulched material is not acceptable under roadways and at building site locations. <br /> Any mulched material deposited or buried must have at least 5 foot vertical separation from the natural groundwater table. If the <br /> applicant proposes to integrate mulched material with clean fill on-site,the applicant is advised to contact the County Environmental <br /> Health Department at(772)794-7440 to ensure compliance with state and local requirements. <br /> 6. This land clearing permit requires that the subject property's pre-development storm water run-off discharge rate not be exceeded <br /> after the clearing operation is completed. This may require construction of temporary detention ponds or berms, and installation of <br /> erosion control devices, such as silt screens and/or hay bales, in order to maintain pre-development drainage flow characteristics and <br /> to protect against sedimentation and turbidity in discharge waters. All drainage and erosion control measures required on the <br /> approved project site plan,as applicable,are in effect for this permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.