My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The person or company conducting the land clearing must be a licensed contractor registered in Indian River County to perform <br /> such work. The applicant is advised to contact the County Building Division at (772) 226-1260 to ensure that the land clearer has <br /> required licensing. <br /> 8.This permit does not authorize the demolition of structures,as applicable.Demolition of structure(s)requires a separate demolition <br /> permit through the County Building Division.For more information,contact the County Building Division at(772)226-1260. <br /> OTHER INFORMATION: <br /> 1. This permit authorizes land clearing for general use field improvements at the South County Park located at 1590 9th Street SW, <br /> in accordance with conditions and specifications of the approved Administrative Approval(AA-16-06-73/91090060-76627). <br /> 2. As noted on the approved Administrative Approval,there shall be no clearing or removal of any existing vegetation,except for <br /> removal of nuisance exotic vegetation(if applicable),from the 60'wide Oslo Road buffer or the 40'wide 20th Avenue SW <br /> buffer. <br /> 3. Best management practices are to be used to eliminate or reduce soil erosion.This includes using devices such as hay bales,silt <br /> screens,or berms.These devices need to be properly installed prior to commencement of construction activities on the property, <br /> need to be maintained,and shall remain in place until the soil surface has stabilized. <br /> 4. Any Gopher Tortoise burrows located within or near(-25 feet)the scope of work must be relocated or avoided per FWC <br /> guidelines. <br /> DATE OF PERMIT ISSUANCE: 5/19/2016 <br /> DATE OF PERMIT EXPIRATION: Concurrent with approved Administrative Approval <br /> SIGNATURE OF UTHORIZATION: <br /> STEVEN HITT <br /> Environmental Planner <br /> Indian River County <br /> cc: County Engineer <br /> Current Development Staff <br /> (site plan/plat related permits only) <br /> Project No./Permit No.: 91090060/76628 <br /> 1dr,letter <br />
The URL can be used to link to this page
Your browser does not support the video tag.