My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> �glVErp Board of County Commissioners <br /> o z <br /> 180127th Street <br /> c Vero Beach, Florida 32960-3365 <br /> *•sLORI�P Telephone: (772) 567-8000 <br /> Fax: (772) 778-9391 <br /> Mandatory Pre-Bid Meeting Question Responses <br /> Project Name: SOUTH COUNTY PARK GENERAL USE FIELD <br /> Bid Number: 2016048 <br /> IRC Project Number: 1425 <br /> Pre-Bid Meeting Date: August 10, 2016 <br /> Questions noted requiring answers <br /> -James Ennis noted that all questions would have a formal written response that would <br /> be supplied to the potential bidders. <br /> 1. Location of the Stockpile indicated in the Bid Docs (5000-CY)? <br /> o Answer#1: The Stockpile is located approximately 800 feet west of the <br /> intersection of Oslo Rd and 20th Ave. SW on the north side of the road. <br /> (Approx. Lat/Long: 27deg 35'15.38"N, 80deg 24'31.18"W) <br /> 2. Type of Sod required? <br /> o Bahia Sod or approved equivalent will be acceptable. Also, please see <br /> General Note #14 on Sheet C2. <br /> 3. Access to Stockpile (Will IRC allow access along backside of storm water Pond?) <br /> o IRC will allow access to the pond via the backside of the storm water pond <br /> immediately to the west; however, contractor will be responsible, at their <br /> cost,for providing a stabilized pathway along the north side of the pond, <br /> modifying the fence for gated access meeting IRC standards and restoring <br /> the pond area within 14-days of completion of hauling activities. <br /> 4. Clarification regarding exclusion area around IRCUD well. <br /> o Vibratory equipment is not allowed within the 50 ft exclusion zone. Heavy <br /> equipment is allowed up to the existing chain link fence line surrounding <br /> the well for clearing and grubbing activities unless otherwise restricted by <br /> another contract condition such as tree protection (drip line). <br /> DEADLINE FOR QUESTIONS IS 8:30 A.M., MONDAY AUGUST 15th, 2015 <br /> P\Public\Yorks\ENGINE-EKING DIVISION PROJECTS\1425-S County Park-General Use FieldVWrnin\bid documents\Pre-bid NIeetin9\IRC-1425_Pre- <br /> bid Question Response_20160810 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.