My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concept of the completed Project as a functioning 4 When "furnish," "install," "perform," or <br /> whole as shown or indicated in the Contract "provide" is not used in connection with services, <br /> Documents (unless there is a specific statement materials, or equipment in a context clearly <br /> indicating otherwise). The use of any such term or requiring an obligation of CONTRACTOR, <br /> adjective shall not be effective to assign to ENGI- "provide" is implied. <br /> NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or E. Unless stated otherwise in the Contract Docu- <br /> authority to undertake responsibility contrary to the ments, words or phrases which have a well-known <br /> provisions of paragraph 9.10 or any other provision technical or construction industry or trade meaning are <br /> of the Contract Documents. used in the Contract Documents in accordance with <br /> such recognized meaning. <br /> B. Day <br /> 1. The word "day" shall constitute a ARTICLE 2 - PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> 2.01 Delivery of Bonds <br /> C. Defective <br /> A. When CONTRACTOR delivers the executed <br /> 1 The word "defective,"when modifying Agreements to OWNER, CONTRACTOR shall also <br /> the word "Work," refers to Work that is deliver to OWNER such Bonds as CONTRACTOR <br /> unsatisfactory, faulty, or deficient in that it does may be required to furnish. <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection, 2.02 Copies of Documents <br /> reference standard, test, or approval referred to <br /> in the Contract Documents, or has been A. OWNER shall furnish to CONTRACTOR up <br /> damaged prior to ENGINEER's recom- to ten copies of the Contract Documents. Additional <br /> mendation of final payment (unless responsi- copies will be furnished upon request at the cost of <br /> bility for the protection thereof has been reproduction. <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph 2.03 Commencement of Contract Times; Notice <br /> 14.04 or 14 05). to Proceed <br /> D Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1. The—we.rd- "furnish," when used in ment or, if a Notice to Proceed is given, on the day <br /> Gernest,on with services, mateFia;s, sf indicated in the Notice to Proceed. A Notice to Pro- <br /> equipment, shall nean to supply and del ver ceed may be given at any time within 30 days after the <br /> said seFV*Ges FriateFialsGF equipment to the Effective Date of the Agreement. In no event will the <br /> Contract Times commence to run later than the <br /> use or „stall.,+ion -and- iR usable eF ninetieth day after the day of Bid opening or the <br /> senditiGR. thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> �. <br /> The-werd""ias ll," whea—used in <br /> se.nnenstien with seFv ses, materials, eF 2.04 Starting the Work <br /> equipmeRt, shall Fnean to put Onto use Gr p!aG-e <br /> in final position smdseNiGes, rnateFi ls, er A. CONTRACTOR shall start to perform the <br /> Work on the date when the Contract Times com- <br /> use. mence to run. No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 3. The weFds u <br /> run. <br /> when used *n nnnneGbGR with�eru Ges <br /> 2.05 Before Starting Construction <br /> and—ins install said— sew;aes, F+aaM Na;s, er <br /> A. CONTRACTOR's Review of Contract Docu- <br /> ase. ments: Before undertaking each part of the Work, <br /> CONTRACTOR shall carefully study and compare the <br /> 00700-General Conditions REV 510-13 <br /> 00700-8 <br /> F"1Public Works\ENGINEERING DIVISION PROJECTS11425 S County Park-General Use FieldWmWbid documentsWaster Contract Documents100700-General Conditions REV 510- <br /> 13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.