My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents and check and verify pertinent :corking uRdeFsta^Ming among the paFties s to +� <br /> figures therein and all applicable field measurements. <br /> Work and to d;sGuss the sGhedules FefeFred to an paFa- <br /> CONTRACTOR shall promptly report in writing to <br /> ENGINEER any conflict, error, ambiguity, or <br /> discrepancy which CONTRACTOR may discover and Payment, and Fnai^+^iging . Fed . gFdS. <br /> shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected 2.07 Initial Acceptance of Schedules <br /> thereby; however, CONTRACTOR shall not be liable <br /> to OWNER or ENGINEER for failure to report any A. Unless otherwise provided in the Contract <br /> conflict, error, ambiguity, or discrepancy in the Documents, at least ten days before submission of the <br /> Contract Documents unless CONTRACTOR knew or first Application for Payment a conference attended by <br /> reasonably should have known thereof CONTRACTOR, ENGINEER, and others as appropri- <br /> ate will be held to review for acceptability to ENGI- <br /> B. Preliminary Schedules: Within ten days after NEER as provided below the schedules submitted in <br /> the Effective Date of the Agreement(unless otherwise accordance with paragraph 2.05.13. CONTRACTOR <br /> specified in the General Requirements), CONTRAC- shall have an additional ten days to make corrections <br /> TOR shall submit to ENGINEER for its timely review- and adjustments and to complete and resubmit the <br /> schedules. No progress payment shall be made to <br /> 1. a preliminary progress schedule CONTRACTOR until acceptable schedules are <br /> indicating the times (numbers of days or dates) submitted to ENGINEER. <br /> for starting and completing the various stages <br /> of the Work, including any Milestones specified 1. The progress schedule will be <br /> in the Contract Documents; acceptable to ENGINEER if it provides an <br /> orderly progression of the Work to completion <br /> 2. a preliminary schedule of Shop within any specified Milestones and the <br /> Drawing and Sample submittals which will list Contract Times. Such acceptance will not <br /> each required submittal and the times for sub- impose on ENGINEER responsibility for the <br /> mitting, reviewing, and processing such progress schedule, for sequencing, scheduling, <br /> submittal; and or progress of the Work nor interfere with or <br /> relieve CONTRACTOR from CONTRACTOR's <br /> 3 a preliminary schedule of values for full responsibility therefor. <br /> all of the Work which includes quantities and <br /> prices of items which when added together 2. CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals. <br /> will include an appropriate amount of overhead <br /> and profit applicable to each item of Work. 3 CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> and substance if it provides a reasonable <br /> allocation of the Contract Price to component <br /> each deliver to the tither, with--dies to—eaGR parts of the Work. <br /> Gendit+ens, Ger#if,iGates o insufa„GG —(and— ether ARTICLE 3-CONTRACT DOCUMENTS. INTENT, <br /> evidease of insuranGwhiG.h eitheF ef them or any AMENDING, REUSE <br /> CONTRACTOR aad—O:OWNER respeGtvery—are <br /> 301 Intent <br /> ArtiGle 5. <br /> A. The Contract Documents are comple- <br /> 2 06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all. <br /> to FuR, but befoFe any Wank at the Sate as staFted B. It is the intent of the Contract Documents to <br /> describe a functionally complete Project(or part there- <br /> and others a +e will be held to es+-Mesh a of) to be constructed in accordance with the Contract - <br /> 00700-General Conditions REV 570.13 <br /> 00700-9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1425 S County Park-General Use FieldlAdmin\bid documentslAAaster Contract Documents\00700-General Conditions REV 510- <br /> 13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.