Laserfiche WebLink
PROPOSAL <br /> dao o� 6d %Z9 <br /> HARK R/O SYSTEiNIS,INC.-310 CENTER COURT-VENICE,FLORIDA 3428 <br /> (P)941-488-9671 -(F)941-488-9400 <br /> Kimley-Horn ATTN: NICK BLACK 8/24/2016 <br /> 1920 Wekiva Way, Email: Nick.Black@kimley-horn.com <br /> West Palm Beach, FL 33411 Proposal Request: Finished Water Sample Panel, Total <br /> Permeate Pressure Transmitters(Trains#1 & #2), Total <br /> Permeate Conductivity Transmitters(Trains#1-8), <br /> Trains#I &#2 Spare Parts <br /> Dear Mr. Black, <br /> Harn R/O Systems, Inc. is pleased to present the following combined change request proposal for The North Hobart WTP <br /> Membrane Replacement Project. <br /> Task#1: <br /> This request includes this supply, installation, and calibration of the instrumentation scope of supply detailed below: <br /> - Provide eight(8) Rosemount 1056 total permeate conductivity analyzers; one for each train (1-8). Analyzers <br /> shall be 24VDC loop powered. Analyzer will be provided with 2 Channel contacting conductivity <br /> capabilities and 4-20mA output. Should HART protocol be required please add $635.00 per transmitter. <br /> - Provide eight(8) Rosemount 400 VP total permeate conductivity sensors; one for each train(1-8). Sensors to <br /> be installed on the total permeate line of each train. <br /> - Provide two(2) Rosemount 3051 smart pressure transmitters; one for train 1 and one for train 2. Pressure <br /> transmitters shall be 24VDC loop powered and provided complete with-14.7-300 psig pressure range 4- <br /> 20mA output with HART protocol, local LCD operator display, and integral 3 valve manifold. <br /> - Provide and install electrical wiring as required to add instruments to existing trains. Verify existing cables and <br /> or provide cables from proposed added instruments to RIO-2 for Train 1-4 and RIO-5 for Trains 5-8 Label <br /> all new cables and terminate within the RIO cabinets. <br /> - Installation includes PVC installation fittings complete with 316 stainless steel hardware as required for a <br /> complete installation. <br /> - Integration of instrumentation into plant SCADA shall be by others. <br /> Exceptions and Clarifications: <br /> 1. SCADA Programming, <br /> 2. Additional Instrument 1/0 cards(if required) <br /> 3. Additional time may be required and will be requested upon receipt of additional equipment for incorporation <br /> into the work. <br /> 4. Expected lead time for equipment 6-8 weeks after receipt of order. <br />