My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-176
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 1:17:35 PM
Creation date
10/19/2016 1:17:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
10/18/2016
Control Number
2016-176
Agenda Item Number
8.H.
Entity Name
Ham R/O Systems Inc.
Subject
Harn R/O Systems Membrance replacement for R/O skids
Change Order No.1
Area
RO Water Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task#2: <br /> This pricing includes each prices for the following recommended vessel spare parts for Codeline E8U pressure vessels. <br /> 1. Qty 96- Head Seals, P/N#45320..................................................................................................$18.15 each <br /> 2 Qty 3 - Permeate Port Seals, P/N#CH50292 (20 per kit) ............. .............................................$24.75 per kit <br /> 3. Qty 5 - Securing Rings, P/N# 50562..............................................................................................$85.80 each <br /> 4. Qty 5 - Locking Ring Sets, P/N#CH45098-3K.............................................................................$99.00 per set <br /> 5. Qty 96 - Permeate Port Retaining Clips.........................................................................................$16.50 each <br /> 6. Qty 288 - Securing Screws, PM#45228....... ............................................................ ..................$2.20 each <br /> Exceptions and Clarifications: <br /> 1. Lead time: 3-4 weeks ARO. <br /> Task#3 <br /> This price ' cludes the installation of the sample piping from the clearwell area to the process roo <br /> - Supply and in one(1)three valve sample panel designed to sample the n ank blend, south bank blend, <br /> and finished water. anel shall be constructed of/4" FRP sheet provided complete with three(3)316 <br /> SS Swagelok '/4"turn plug es. T to e wall via 1 5/8"aluminum unistrut. <br /> EXCLUDED <br /> - Provide and install one (1)2" Sch. 80 FROM THIS ed into the wall for routing of the 1/4" sample <br /> tubing. CHANGE <br /> ORDER <br /> - Provide and install '/4"sample ng ple is to the sample panel. See exclusions. <br /> ExceptionsRoposal <br /> atio <br /> I. f the 2"PVC sleeves under the concrete drive only. <br /> 2. udes the PVC sleeves and hand digging the trench in the grass area on either side of the e. <br /> est fit to saw cut and replace concrete drives. <br /> Totalfor asks 1-3 ................................................................................................. .88 <br /> TASKS 1-2, <br /> $90,007.58 <br /> ONLY <br /> We Propose hereby to furnish material and labor—complete in accordance with above specifications,for the sum of See above <br /> All materials is guaranteed to be as specified.All work to be completed in a workmanlike <br /> manner according to standard practices.Any alteration or deviation from above specifica- <br /> ions involving extra costs will be executed only upon written orders,and%will become an Authorized Signature: <br /> extra charge over and above the estimate.All agreements contingent upon strikes,accidents <br /> or delays beyond our control.Owner to carry fire,tomado and other necessary insurance. NOTE.This proposal may be <br /> Our workers are fully covered by Workmen s Compensation Insurance. Withdrawn by HARN if not accepted within 30 calendar days. <br /> Acceptance of Proposal-The above prices,specifications and <br /> conditions are satisfactory and are hereby accepted.You are authorized Signature <br /> to do the work as specified.Payment will be made as outlined above. <br /> Signature: <br /> Date of Acceptance: <br />
The URL can be used to link to this page
Your browser does not support the video tag.