Laserfiche WebLink
b Finis d Water Sample Panel Cost Extended <br /> MATERI <br /> Shop Fab ' ate&supply three valve sample panel-1/4"FRP,Aluminum Strut&Hardware 1 Ea 384.00 384.0 <br /> 316 SS Swage k 1/4 turn plug valves 3 Ea 125.00 3 .00 <br /> PVC Sample tubin Sleeves 0 Ea 0.00 0.00 <br /> 2"Long Radius 90 Ben 3 Ea 26.75 80.25 <br /> 2"PVC Piping Sleeves 120 Ft 4 504.00 <br /> 1/4"Sample Tubing low press 1 Roll) 1000 LF .20 200.00 <br /> Compression Fittings 1 LS 62.00 62.00 <br /> Misc Materials 1 LS 290.00 290.00 <br /> 0 E 0.00 0.00 <br /> Adder 1,895.25 <br /> 5% Overhead 94.7625 <br /> Sub Total 1,990.01 <br /> 10% Mark up 199.00125 <br /> 2,189.01 <br /> Freight 0.00 <br /> 2,189.01 <br /> b Finished Water Sample Panel Cost Extended <br /> LABOR <br /> Engineering 10 Ea 125.00 1,250.00 <br /> Onsite Labor-2 Men 5 days 80 Ea 65.00 5,200.00 <br /> Onsite Labor OT-2 per day&6 travel 32 Ea 97.50 3,120.00 <br /> 0.00 0.00 <br /> Onsite Expenses(Hotel,Vehicle,Fuel,Per-diem) LS 1,99562 1,995.62 <br /> Adder 11,565.62 <br /> 5% Overhead 578.281 <br /> Sub al 12,143.90 <br /> 10% <up 1214.3901 <br /> 13,358.29 <br /> Freight 0.00 <br /> 58.29 <br /> Tota I 15,547.3 <br />