My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-176
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 1:17:35 PM
Creation date
10/19/2016 1:17:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
10/18/2016
Control Number
2016-176
Agenda Item Number
8.H.
Entity Name
Ham R/O Systems Inc.
Subject
Harn R/O Systems Membrance replacement for R/O skids
Change Order No.1
Area
RO Water Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c Additional Conductivity Instrumentation Cost Extended <br /> MATERIALS <br /> Rosemount 1056 total permeate conductivity analyzers p/n 56-03-20-30-AN 8 Ea 1,470.00 11,760.00 <br /> Rosemount 400 VP Sensor-P/N 400VP-11-36 8 Ea 626.00 5,008.00 <br /> Rosemount 45'Sensor Cable Extension w/VP connectors 8 Ea 315.00 2,520.00 <br /> Rosemount 3051 Total Permeate Pressure Transmitters 2 Ea 3,365.92 6,731.84 <br /> 0 Ea 000 0.00 <br /> 10x4 PVC Reducing Saddle 8 Ea 432.77 3,462.16 <br /> 4x3 PVC Reducing Bushing 8 Ea 42.51 340.08 <br /> 3 x 3/4 SS Reinforced Reducing Bushing 8 Ea 6749 539.92 <br /> 1/4"Sample Tubing low pressure(1 Roll) 1000 LF 0.20 200.00 <br /> 316 SS hardware&Consumables 8 Ea 26000 2,080.00 <br /> 8 Ea 0.00 0.00 <br /> 0 Ea 0.00 0.00 <br /> 0 Ea 0.00 0.00 <br /> Adder 32,642.00 <br /> 5% Overhead 1632.1 <br /> Sub Total 34,274.10 <br /> 10% Mark up 3427.41 <br /> 37,701.51 <br /> Freight 875.00 <br /> 38,576.51 <br /> c Additional Conductivity Instrumentation Cost Extended <br /> SUBCONTRACTS <br /> Paragon Electric 1 LS 18,667.00 18,667.00 <br /> Integration-Excluded 0 Ea 0.00 0.00 <br /> 0 Ea 0.00 0.00 <br /> Adder 18,667.00 <br /> 5% Overhead 933.35 <br /> Sub Total 19,600.35 <br /> 10% Mark up 1960.035 <br /> 21,560.39 <br /> Freight 0.00 <br /> 21,560.39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.