Laserfiche WebLink
c Additional Conductivity Instrumentation Cost Extended <br /> LABOR <br /> Engineering 40 Ea 125.00 5,00000 <br /> Onsite Labor-3 Men 5 days 120 Ea 65.00 7,800.00 <br /> Onsite Labor OT-2 per day&6 travel 48 Ea 97.50 4,680.00 <br /> 000 0.00 <br /> Onsite Expenses(Hotel,Vehicle,Fuel,Per-diem) 1 LS 2,993.43 2,993.43 <br /> Adder 20,473.43 <br /> 5% Overhead 1,023.67 <br /> Sub Total 21,497 10 <br /> 10% Mark up 2,149.71 <br /> 23,646.81 <br /> Bond 1,165.62 <br /> 24,812.43 <br /> Total 84,949.33 <br /> Grand Total 105, <8 <br /> $90,007.58 <br />