Laserfiche WebLink
Mr. Kwasi Badu-Tweneboah, Ph.D., P.E., F.ASCE <br /> Geosyntec Consultants, Inc. <br /> September 13,2016 <br /> Page 3 <br /> passivated canisters, compositing samples from three locations into each canister for a total of three <br /> additional samples analyzed. <br /> Table 2: Optional Test Program,Cell 1 of Segment 3 Expansion <br /> Parameter Method Duration <br /> n) <br /> r ' n Comment <br /> Samples <br /> NMOC EPA Method 25C 9 5 to 10 Three sample locations shall be <br /> composited as one canister <br /> Oxygen (02) EPA Method 3C 9 5 to 10 Three sample locations shall be <br /> composited as one canister <br /> Nitrogen (N2) EPA Method 3C 9 5 to 10 <br /> Three sample locations shall be <br /> composited as one canister <br /> Methane (CH4) EPA Method 3C 9 5 to 10 Three sample locations shall be <br /> composited as one canister <br /> Carbon Dioxide (CO2) EPA Method 3C 9 5 to 10 <br /> Three sample locations shall be <br /> composited as one canister <br /> TRC will review the EPA website (http://www.epa.gov/ttn/emc/email.html#audit) in advance of the test <br /> program to determine if audit samples are available for this scope of work. If audit samples are available <br /> and the applicable regulatory agency(s) requires them for this scope of work, TRC can procure them on <br /> behalf of Geosyntec. Note that this process may take up to 30 days,and will require a change order. <br /> Project Schedule <br /> TRC will execute the referenced scope of services according to the following schedule: <br /> Table 3: Proposed Test Program Schedule (per Table 1 testing only) <br /> Day Activity #of On-site <br /> Staff Hours <br /> Collect three samples for NMOC, 02, N2, CO2, and 02 <br /> Tuesday, <br /> October 18, 2016 analysis from the Landfill Flare Skid Header, at a location 1 3 hours <br /> prior to the condensate removal system. <br /> All project days are considered consecutive weekdays and are scheduled to begin at 8:00 AM local time <br /> unless otherwise stated. TRC personnel shall not work more than sixteen hours in any day, nor more than <br /> ninety-one hours over a rolling seven-day period. We recommend scheduling projects a minimum of two <br /> weeks in advance to allow for the optimum allocation of resources. <br /> Deliverables <br /> TRC will provide Geosyntec with the following deliverables: <br /> • A draft of the report will be submitted no more than thirty calendar days after the completion of <br /> testing and receipt of all facility operational data. <br /> 0 <br /> Proposal Number 264523.9990 <br />