Laserfiche WebLink
Mr. Kwasi Badu-Tweneboah,Ph.D., P.E., F.ASCE <br /> Geosyntec Consultants, Inc. <br /> September 13,2016 <br /> Page 5 <br /> Overnight Wire Transfer <br /> TRC Lockbox Beneficiary Account Number: 2232037090 <br /> Attn: 536282 Beneficiary Account Name: <br /> 307 23rd Street Extension, Suite 950 TRC Companies, Inc. -Concentration Account <br /> Pittsburgh, PA 15215 <br /> Tel:877-550-5933 Bank Codes: <br /> Note: The lockbox number is a ACH ABA No: 011500120(Wires only) <br /> required field in the address label Routing#: 211170114(ACH only) <br /> Swift Code No: CTZIUS33 <br /> Bank Name: RBS Citizens <br /> Remittance Detail Email: Arremitdetail@TRCSolutions.com <br /> US Postal Service <br /> TRC Lockbox TRC Contact: Paul McShane <br /> P. 0. Box 536282 TRC Contact Phone Number: 860-298-6393 <br /> Pittsburgh, PA 15253-5904 Reference: Reference invoice No. <br /> Basis for Proposed Price <br /> Unless specified elsewhere in this proposal, personal protective equipment(PPE)worn by TRC will consist <br /> of gloves, safety glasses, high-visibility reflective vests, hearing protection, hard hats and steel-toed <br /> leather shoes/boots. If additional PPE is required but not specified herein, a change order may be <br /> required. <br /> Our price is based on Geosyntec or the facility supplying TRC with the following items in order for this <br /> project to be executed as it has been proposed. <br /> 1. Copies of any test protocols, permits or agency communications, not prepared by TRC, that <br /> are relevant to the proposed scope of work. <br /> 2. Safe access to test locations. All known potential hazards, potential exposures and facility <br /> safety requirements must be communicated to TRC in advance of test team mobilization. <br /> Delays due to unsafe working conditions or unresolved safety concerns will result in additional <br /> charges,which will require a change order. <br /> 3. Washroom facilities for use by TRC employees. <br /> 4. A landfill gas analyzer, such as a GEM2000, equipped with a sampling pump and calibrated <br /> prior to the sampling event. This shall be used for system purges and to verify that the landfill <br /> gas going to the canister is free of ambient air leaks. <br /> 5. Should the Table 2 option be selected,the landfill facility shall supply a front-end loader with <br /> operatorforfour hours duringthe first dayto push and remove the pilot probe into the landfill <br /> cover for placement of sampling probes. The front-end loader and operator shall be supplied <br /> for approximately two hours the second day to remove the probes that were installed into <br /> the cover. <br /> Agency Notification <br /> There may be a requirement to contact regulatory agencies regarding this scope of work. TRC will not <br /> initiate contact with any regulatory agency regarding this scope of work unless directed to do so in writing <br /> Proposal Number 264523.9990 F= <br />