My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-186
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 12:26:17 PM
Creation date
10/20/2016 12:26:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/18/2016
Control Number
2016-186
Agenda Item Number
15.B.1
Entity Name
Geosyntec Consultants
Subject
Work Order No.5 Title V Air Operation Permit Renewal
Project Number
407190-4-84-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Kwasi Badu-Tweneboah,Ph.D., P.E., F.ASCE <br /> Geosyntec Consultants, Inc. <br /> September 13,2016 <br /> Page 5 <br /> Overnight Wire Transfer <br /> TRC Lockbox Beneficiary Account Number: 2232037090 <br /> Attn: 536282 Beneficiary Account Name: <br /> 307 23rd Street Extension, Suite 950 TRC Companies, Inc. -Concentration Account <br /> Pittsburgh, PA 15215 <br /> Tel:877-550-5933 Bank Codes: <br /> Note: The lockbox number is a ACH ABA No: 011500120(Wires only) <br /> required field in the address label Routing#: 211170114(ACH only) <br /> Swift Code No: CTZIUS33 <br /> Bank Name: RBS Citizens <br /> Remittance Detail Email: Arremitdetail@TRCSolutions.com <br /> US Postal Service <br /> TRC Lockbox TRC Contact: Paul McShane <br /> P. 0. Box 536282 TRC Contact Phone Number: 860-298-6393 <br /> Pittsburgh, PA 15253-5904 Reference: Reference invoice No. <br /> Basis for Proposed Price <br /> Unless specified elsewhere in this proposal, personal protective equipment(PPE)worn by TRC will consist <br /> of gloves, safety glasses, high-visibility reflective vests, hearing protection, hard hats and steel-toed <br /> leather shoes/boots. If additional PPE is required but not specified herein, a change order may be <br /> required. <br /> Our price is based on Geosyntec or the facility supplying TRC with the following items in order for this <br /> project to be executed as it has been proposed. <br /> 1. Copies of any test protocols, permits or agency communications, not prepared by TRC, that <br /> are relevant to the proposed scope of work. <br /> 2. Safe access to test locations. All known potential hazards, potential exposures and facility <br /> safety requirements must be communicated to TRC in advance of test team mobilization. <br /> Delays due to unsafe working conditions or unresolved safety concerns will result in additional <br /> charges,which will require a change order. <br /> 3. Washroom facilities for use by TRC employees. <br /> 4. A landfill gas analyzer, such as a GEM2000, equipped with a sampling pump and calibrated <br /> prior to the sampling event. This shall be used for system purges and to verify that the landfill <br /> gas going to the canister is free of ambient air leaks. <br /> 5. Should the Table 2 option be selected,the landfill facility shall supply a front-end loader with <br /> operatorforfour hours duringthe first dayto push and remove the pilot probe into the landfill <br /> cover for placement of sampling probes. The front-end loader and operator shall be supplied <br /> for approximately two hours the second day to remove the probes that were installed into <br /> the cover. <br /> Agency Notification <br /> There may be a requirement to contact regulatory agencies regarding this scope of work. TRC will not <br /> initiate contact with any regulatory agency regarding this scope of work unless directed to do so in writing <br /> Proposal Number 264523.9990 F= <br />
The URL can be used to link to this page
Your browser does not support the video tag.