My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-186
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 12:26:17 PM
Creation date
10/20/2016 12:26:15 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. Managing Director <br /> 21 September 2016 <br /> Page 5 <br /> • changes to current Title V Air Operation Permit; <br /> • Fuel analysis or specification; <br /> • Detailed description of control equipment; <br /> • Procedures for startup and shutdown; <br /> • Operation and maintenance plan; <br /> • Previously submitted information; and <br /> • Identification of applicable requirements <br /> Geosyntec will describe the existing emission control system for IRCL facility, and calculate the <br /> emissions of air pollutants expected to be released into the environment by its operation. <br /> Geosyntec will complete the required FDEP Form 62-210.900(1), and prepare a transmittal letter <br /> to FDEP that summarizes the permit renewal application package. <br /> Phase 4—Response to Regulatory Comments <br /> Following submittal of the Permit Renewal Application, Geosyntec will meet with the Southeast <br /> District office of the FDEP Air Resource Management Division to present and discuss the <br /> application package. This meeting may be held via teleconference in order to reduce overall <br /> costs to the project. Geosyntec will provide FDEP with written responses to RAIs throughout <br /> the course of the permit application review process. For the purpose of the budget estimate, <br /> Geosyntec has estimated one response to FDEP RAI will be required. <br /> Geosyntec will also review and provide comments on the draft Title V Permit issued by FDEP to <br /> ensure that it's consistent with the facility requirements and does not contain unexpected <br /> compliance and monitoring requirements. <br /> SCHEDULE <br /> Geosyntec will initiate work immediately upon receipt of Notice to Proceed (NTP) from SWDD. <br /> Geosyntec has assumed that this NTP would be issued no later than I 1 October 2016 in order for <br /> us to complete the work and submit the Title V Air Operation Permit Renewal Application to <br /> FDEP before the deadline of December 2, 2016. Also, we have tentatively scheduled the field <br /> sampling work for October 18, 2016 and will need to notify FDEP 2 weeks prior to the field <br /> work. <br /> NCP2016-2255UL16043_Title V Air Permit Renewal Proposal.doe <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.