My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-186
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 12:26:17 PM
Creation date
10/20/2016 12:26:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/18/2016
Control Number
2016-186
Agenda Item Number
15.B.1
Entity Name
Geosyntec Consultants
Subject
Work Order No.5 Title V Air Operation Permit Renewal
Project Number
407190-4-84-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. Managing Director <br /> 21 September 2016 <br /> Page 6 <br /> BUDGET ESTIMATE AND ASSUMPTIONS <br /> The following assumptions were used to prepare the budget estimate discussed below: <br /> • Sampling of the landfill gas, including the probe samples from Cell 1, will require two <br /> (2) days of field time. Geosyntec will provide oversight including staking the locations <br /> for the gas probe and providing a landfill gas analyzer to purge the gas sampling probes <br /> prior to sample collection. <br /> • SWDD will provide a front-end loader and operator to assist with installation of the gas <br /> probes in Cell 1. <br /> • The field work is tentatively scheduled for October 18, 2016 and FDEP notification will <br /> be required two weeks prior to this date (i.e. by October 4, 2016). <br /> • Meetings with FDEP will be held via teleconference. <br /> The budget estimate for the scope of work outlined in this proposal is summarized in the <br /> following table, and a detailed budget estimate is provided as Attachment B. Note that the <br /> budget estimate for Phase 2 includes TRC's fees for collecting the samples and testing. The <br /> budget estimate does not include permit fees that will be required at the time the permit <br /> application is submitted to FDEP. <br /> Phase 1 —General Consulting/Meeting Support/Project Management $12,289 <br /> Phase 2—Tier 2 Testing and Reporting $20,651 <br /> Phase 3 —Title V Renewal Permit Application $25,243 <br /> Phase 4: Response to Regulatory Comments $5,924 <br /> Total Budget Estimate 564,107 <br /> Geosyntec will not exceed the cost estimate without prior approval and written authorization <br /> from SWDD. <br /> NCP2016-2255UL16043_Title V Air Permit Renewal Proposal.doc <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.